organization of the construction site and preparing construction materials on-site can cause high additional
costs. This was seen in the researches of Van der Linden, Janssens and Knapen in Belgium, which studied
two cases with rammed earth and compressed earth block constructions respectively [7, p.177].
4. Case studies. In order to look at the recent developments in the area of feasibility of wood and earth
structures following projects are being briefly researched for their characteristics, which are resulting from
the construction technique and technology based on the two materials. It is needed to say, of course, the
complete construction from wood or earth is not yet possible by neglecting such important material in our
built environment, which concrete is. However, building hybrid construction elements and structures from
wood and concrete, or earth and concrete should not be regarded as defect, but rather as a comprehensive
way of construction. Low impermeability, durability in high moisturized conditions and high structural
strength guarantee concrete the priority in constructions of foundations and building cores, which make up
the structural stability in timber-framed buildings built in high seismic activity zones.
In Table 1 five case studies are being documented with different criteria with the aim to grasp the up-
to-date wooden and earthen building technologies built and envisioned worldwide.
Project name, Location,
Architects
Storeys Structural support frame
Gross floor
area
Cost /
Award
Alnatura Campus
[2], Darmstadt,
Germany Archi-tects:
haascookzemmrich
STUDIO2050
3
Reinforced concrete core
Exterior walls out of
69cm thick rammed
earth
13 500 m
2
N/A
German Sustain-
ability Award 2019
Feuillet de Terre Crue[5],
Bagneux, France
Architects: TOA |
architectes associes
6
Reinforced concrete core
Integration of adobe
bricks in exterior walls
2 960 m
2
4 930 000 €
LifeCycle Tower [4], [8, p.
109] Dornbirn, Austria
Architects: Hermann
Kaufmann Architekten
8
Reinforced staircase
core, hybrid timber-
concrete joint ribbed
ceiling, load-bearing
timber structure
2 319 m
2
4 100 000 €
Balthasar-Neumann-
Award 2014
Skaio Wooden [6] Apart-
ment Building, Heilbronn,
Germany
Architects: Kaden + Lager
9
Circulation cores
and ground floor in
reinforced concrete
Prefabricated walls,
pillars of laminated
timber
5 685 m
2
N/A
German Sustain-
ability Award 2020
W350 Project [3], Tokyo,
Japan
Architects: Nikken Sekkei
70
Hybrid steel-timber
structure
Diagonal steel braces
455 000m
2
circa 5 600 000 000 $