Unit 3: analysis of automated flow line & line balancing general Terminology & Analysis



Download 211,11 Kb.
Pdf ko'rish
bet3/20
Sana10.07.2022
Hajmi211,11 Kb.
#769762
1   2   3   4   5   6   7   8   9   ...   20
Bog'liq
mechanical engineering computer-integrated-manufacturing-systems analysis-of-automated-flow-line-line-balancing notes

www.getmyuni.com
2


Where E = the proportion of uptime on the production line. 
An alternative measure of the performance is the proportion of downtime on the line which 
is given by: 
D = 
FT
d
= FTd + 
FT
d
----------------- 6 
T
p
Tc 
Where D = proportion of downtime on the line 
E + D = 1.0 
An important economic measure of the performance of an automated production line is the 
cost of the unit produced. The cost of 1 piece includes the cost of the starting blank that is to 
processed, the cost of time on the production line & the cost of the tool consumed. The cost 
per unit can be expressed as the sum of three factors: 
Cpc = Cm + CoTp + Ct ------------------------ 7 
Where Cpc = cost per piece (Rs / pc) 
Cm = cost per minute to operate the time (Rs / min) 
Tp = average production time per piece (min / pc) 
Ct = cost of tooling per piece (Rs / pc) 
Co = the allocation of capital cost of the equipment over the service life, labour to 
operate the line, applicable overheads, maintenance, & other relevant costs all reduced to 
cost per min. 
Problem on Transfer line performance: 
A 30 station Transfer line is being proposed to machine a certain component currently 
produced by conventional methods. The proposal received from the machine tool builder 
states that the line will operate at a production rate of 100 pc / hr at 100% efficiency. From a 
similar transfer line it is estimated that breakdowns of all types will occur at a frequency of 
F = 0.20 breakdowns per cycle & that the average downtime per line stop will be 8.0 
minutes. The starting blank that is machined on the line costs Rs. 5.00 per part. The line 
operates at a cost for 100 parts each & the average cost per tool = Rs. 20 per cutting edge. 
Compute the following: 
1. Production rate 
2. Line efficiency 
3. Cost per unit piece produced on the line 
Solution: 
1.
At 100% efficiency, the line produces 100 pc/hr. The reciprocal gives the unit time 
or ideal cycle time per piece. 
Tc = 1 = 0.010hr / pc = 0.6 mins 
100
The average production time per piece is given by: 

Download 211,11 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   20




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish