Total cost of ownership district guidelines (revised)


Various Stages of Ownership



Download 2,19 Mb.
bet4/9
Sana26.06.2017
Hajmi2,19 Mb.
#16233
1   2   3   4   5   6   7   8   9

Various Stages of Ownership

New Acquisition



Facilities Life-Cycle Stages (50-years or Longer)



Facility Life Cycle Stage (Example - $200 M (TCO)

5. PCCD MAINTENANCE & OPERATIONS’ FACILITIES CONDITION INDEX (FCI)


The Facility Condition Index (FCI) is a benchmark to analyze the effect of investing in facility improvements. The lower the FCI, the lower the need for remedial or renewal funding relative to the facility’s value.

FCI = Total of Building Repair, Upgrade, Renewal Needs
÷ Current Replacement Value of Building Components



A. Peralta Community College District Facility Condition Index


FCI = 51.91% Current (2013)

Repair Cost: $403,787,430

Current Replacement Cost: $777,826,040

Approximately 52% of PCCD’s Capital Assets are Deficient therefore there is no question that more than half of our capital assets need serious attention.



6. ESTABLISHING AN APPROPRIATE ANNUAL LEVEL OF FUNDING FOR MAJOR MAINTENANCE AND CAPITAL OUTLAY RENEWAL


The Industry accepted rule for establishing an appropriate annual level of funding for major maintenance and capital outlay renewal is 2 to 4 percent of the aggregate current replacement value. Based on PCCD 2013 Fusion data, the funding outlay renewal is approximately = $15M to $30M annually1. When a backlog of deferred maintenance has been allowed to accumulate, spending will likely exceed this minimum.2

PCCD funding streams include a variety of resources including Instructional Equipment funds and Physical Plant and Instructional Support Block Grant monies (one-time funds) from the California Community College Chancellor’s Office, Bond Measures, and Facilities and Maintenance funds.



TCO Guidelines presuppose adequate funding. Where practicable, the District may stagger the timeline for major services, in order to spread the costs across different budget periods. Funding must be especially identified to include the establishment of accounts, the amount to be placed in the account, and the source of future funding to pay for reoccurring maintenance, upgrades, and replacements. Funding may be derived from general funds, bonds, tax assessments, loans, rebates, or revenue-generating operations. The District must specify which Department is:

(a) permitted to access the funds, and,

(b) held responsible for project completion.

All funding considerations will rely on the newly revised Budget Allocation Model (BAM) which serves to guide the funding processes and to address staffing needs.



TCO Funding Projections for 5 years include:


(Data Source: Ronald Little, Vice Chancellor for Finance & Administration, August 2016)



Projections for 5 years (continued)


Projections for 5 years (continued)

7. ESTABLISHING TCO STANDARDS



PCCD must determine what standards are acceptable for maintaining equipment, buildings, grounds, and custodial performance. PCCD applies the Association of Physical Plant Administrators (APPA) Standards. APPA Standards address the following: Equipment & Building Standards, Grounds Standards, and Custodial Standards. (SEE APPENDIX FOR APPA Standards).



Applying TCO to newly acquired assets should be easier than migrating existing assets. The acquisition phase is a prime time to negotiate and adapt extended warranties and service agreements.  Similar to the District’s policy that demands green building certification for new construction, the District’s TCO Guidelines must make certification adoption compulsory.

Priorities will be based, in part, on the District’s Mission and Strategic Plan and Objectives. Any material impediments to educating students must be addressed and prioritized accordingly. Safety concerns must be addressed immediately. Items that do not totally undermine education, but make conditions more difficult to educate students (e.g., leaky roofs, inadequate ventilation, poor air quality, noisy HVAC) must also be fixed, but might fall lower on the priorities’ list.



8. INVENTORYING EXISTING BUILDINGS, SYSTEMS, AND EQUIPMENT AS PART OF TCO.

PCCD’s TCO analysis should begin with inventorying and cataloging existing assets and the systems that support the assets. The inventory should document nomenclature, model, serial number, location, identifying narrative description, use/application (classroom, labs, offices, storage, conference rooms, etc.), architectural drawings or sketches, photographs, and video.  The department, work unit, and job position that is responsible for maintaining the asset should also be identified.  The primary users and the department or work unit that operates the assets should be included in the inventory.

The District needs to continue to distribute a maintenance schedule and budget for each maintenance project.

9. ESTABLISHMENT OF DISTRICT TCO PROCEDURES

In addition to the ongoing implementation of administrative guidelines for TCO, the District should consider the development of TCO Guidelines’ procedures. The District could then assign a specific department more specific responsibilities. Furthermore, the District might benefit from the guidance of outside experts, e.g., roofing consultants, professional engineers, and energy and data analysts, as needed.



10. TCO FOR GROUNDS AND EQUIPMENT

The general TCO principles outlined in this document also apply to assets such as grounds. For example, lawns, sprinkler systems, supporting hardware and software, and mechanical equipment (lawn mowers, trucks, sweepers, etc.) must also be subject to TCO.



Download 2,19 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish