Standard for High Voltage eg connections


No  RPEQ for both design & commissioning 2 Yes  Yes  Yes



Download 1,07 Mb.
Pdf ko'rish
bet63/64
Sana06.07.2022
Hajmi1,07 Mb.
#743644
1   ...   56   57   58   59   60   61   62   63   64
Bog'liq
STNW1175-Standard-for-HV-EG-Connections

 
No 
RPEQ for both design & commissioning
2
Yes 
Yes 
Yes
 
Yes 
1. 
Level 1 backup protection – Over and under voltage, over and under frequency and rate of change of frequency.
2. 
Not required for IES EG 
Systems with an aggregate nameplate capacity of ≤ 30 kVA
.


Standard for High Voltage EG Connections 
 
STNW1175 
Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
58 of 60 
Rotating Machine systems
 
Class A1 Rotating Machine systems 
Class A2 Rotating Machine systems 
Limited parallel 
Operation 
Continuous parallel 
Operation 
Limited parallel 
Operation 
Continuous parallel 
Operation 
Bumpless 
transfer 
Stand-by Non-export 
Export 
Bumpless 
transfer 
Stand-by Non-export 
Export 
Level 1 Backup protection

No 
Yes
 
Yes 
Yes 
No 
Yes 
Yes 
Yes 
HV NVD protection
No 
No 
Yes 
Yes 
No 
No
Yes 
Yes 
Power Limit controls
2
No
No
Yes
2
No
No 
No 
Yes
2
No 
Voltage Controlled Overcurrent 
No 
No 
No 
Yes 
No 
No 
No 
Yes 
Grid Isolation Device Required 
No 
No 
No 
No 
No 
Yes 
Yes 
Yes 
Distribution System Technical Study required 
No 
Yes 
Yes 
Yes 
No 
Yes 
Yes 
Yes 
Power quality to AS/NZS 61000 series 
requirements 
No 
Yes 
Yes 
Yes 
No 
Yes 
Yes 
Yes 
Communications / SCADA interface 
No
No
No 
No
No
No
Yes 
Yes 
Fault level contribution to the Distribution System 
included in the Technical Study 
Yes
3
Yes
4
Yes
 
Yes 
Yes
3
Yes
4
Yes 
Yes 
RPEQ for both design & commissioning 
Yes

Yes
Yes
Yes 
Yes 
Yes 
Yes 
Yes 
1. 
Level 1 backup protection – Over and under voltage, over and under frequency and rate of change of frequency.
2. 
Zero power limit for Non-export systems, power limiting controls for partial-export systems. 
3. 
Fault level contribution may be considered for bumpless transfer EG Systems depending on the connecting Distribution System. 
4. 
Fault current contribution is dependent on size, number and hours of operation.
5. 
RPEQ commissioning is not required when electronically controlled interlocking is not implemented and the transfer switch is compliant as per S 4.4.4.



Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   56   57   58   59   60   61   62   63   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish