Standard for High Voltage eg connections


Standard for High Voltage EG Connections



Download 1,07 Mb.
Pdf ko'rish
bet60/64
Sana06.07.2022
Hajmi1,07 Mb.
#743644
1   ...   56   57   58   59   60   61   62   63   64
Bog'liq
STNW1175-Standard-for-HV-EG-Connections

 


Standard for High Voltage EG Connections 
 
STNW1175 
Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
53 of 60 
Appendix B: Connection arrangement requirements (normative)
Following are representations for typical connection arrangements as considered in this Standard. 
Figure 2 Protection arrangement for EG Systems comprising Class A1 IES EG Unit(s) 

Figure 3 Protection arrangement option for a Class A1 EG Systems comprising rotating EG Unit(s) 


Standard for High Voltage EG Connections 
 
STNW1175 
Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
54 of 60 
Figure 4 Protection arrangement option for Class A2 EG System with LV Generating Unit(s)
 
Figure 5 Protection arrangement option for a Class A2 EG Systems comprising of HV Generating Unit(s)


Standard for High Voltage EG Connections 
 
STNW1175 
Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
55 of 60 
Appendix C: Model Standing Offer (informative)
This Section is left intentionally blank. 
Appendix D: Static data and information (informative)
Static data and information shall be provided by the Proponent to the DNSP based on your 
application type and may include some of the following below (but not limited to): 
1. NMI meter numbers
2. System information 
a. Detailed single line diagram demonstrating Fixed EG Units connected, and proposed 
for connection, at the Premise (including detail of any interlocking). 
b. Number of phases available and number of phases DER installed 
c. Energy source
d. Maximum output rating
e. Any proposed Export limit (full / partial / minimal) and method of Export control 
f. Metering scheme information (gross or net) 
3. EG Unit Data 
a. Make, model and manufacturer 
b. Number installed 
c. Power quality modes
4. Device information 
a. Type (e.g. panel, battery)
b. Make, model and manufacturer 
c. Number installed
5. Applicant and Customer information 
a. Type 
b. Business and / or Personal Names 
c. Address and contact information 
6. Installer information 



Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   56   57   58   59   60   61   62   63   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish