h) Cofferdams and caissons – Regulation 32
Every cofferdams or caissons must be:

suitably designed and constructed

appropriately equipped so that people can gain 
shelter or escape if water or material enters

properly 
maintained.
A cofferdam or caisson may be used to carry out con-
struction only if:

it and any work equipment and materials which 
affect its safety have been inspected by a compe-
tent person:

at the start of the shift (only one report required 
every 7 days)

after any event likely to affect its strength or 
stability

the person inspecting is satisfi ed that it is safe.
Where the person who carries out the inspection has 
informed the person on whose behalf the inspection was 
carried out, work must cease until the relevant matters 
have been corrected.
i) Reports of Inspection – Regulation 33
Before the end of the shift in which the report was com-
pleted, the person who carries out the inspection under 
Regulations 31 or 32 must:

inform the person for whom they carried out the 
inspection if they are not satisfi ed that construction 
work can be carried out safely

prepare a report with the particulars set out in sched-
ule 3 to the Regulations as shown in Figure 17.3.
A copy of the report must be provided within 24 hours of 
the relevant inspection. If the inspector is an employee 
SCHEDULE 3 Regulation 33(1)(b)
PARTICULARS TO BE INCLUDED IN A REPORT OF 
INSPECTION
1.
Name and address of the person on whose behalf the 
inspection was carried out. 
2. Location of the place of work inspected. 
3.
Description of the place of work or part of that place 
inspected (including any work equipment and materials). 
4. Date and time of the inspection. 
5.
Details of any matter identifi ed that could give rise to a risk 
to the health or safety of any person. 
6.
Details of any action taken as a result of any matter 
identifi ed in paragraph 5 above. 
7. Details of any further action considered necessary. 
8. Name and position of the person making the report. 

Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   532   533   534   535   536   537   538   539   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2025
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish