General Specification Electrical Function gmw3110 General Motors Local Area Network Enhanced Diagnostic Test Mode Specification



Download 8,35 Mb.
Pdf ko'rish
bet27/406
Sana03.04.2022
Hajmi8,35 Mb.
#525939
1   ...   23   24   25   26   27   28   29   30   ...   406
Bog'liq
gmw3110

C
2
= Certain sub-function parameters may be supported on non-programmable ECUs to support 
manufacturing needs of the ECU supplier or the vehicle assembly plant. 
4.3 Diagnostic Communication Implementation Rules. 
In applying the rules which follow, a diagnostic 
request is considered in process, until the node has fulfilled one of the following (depending on the specific 
service requested): 

The ECU sent the last consecutive frame of an USDT multi-frame positive response. 

The ECU sent an USDT negative response message indicating there is no positive response forthcoming 
(response code other than $78). 

The ECU sent an USDT single frame positive response message. 

The first (or only) UUDT response is received (for services $AA and $A9). 
Note:
Application timing requirements for UUDT diagnostic responses provided via services $A9 and $AA are 
specified in each respective service within this specification. Reference the descriptions of these services for 
additional detail. 
4.3.1 Tester Rules. 
1. A tester is not allowed to send a physically addressed request any time a previous physically addressed 
request is in process. 
2. A tester is not allowed to send a physical request any time a functional request has been received that will 
result in a response, and the response to the functional request is in process. 
3. A tester is not allowed to send a functional request that results in a response if a previous physically 
addressed request is in process. 
--``,,``````,``,,``,,,`,`,`,,-`-`,,`,,`,`,,`---
CameraLoops.com


GM WORLDWIDE ENGINEERING STANDARDS 
GMW3110 
© Copyright 2010 General Motors All Rights Reserved 
February 2010 
Page 20 of 336 
4. A tester is not allowed to send a functional request that results in a response if a previous functionally 
addressed request is in process. 
5. After sending a functionally addressed request which will result in a response, a tester is not allowed to 
send a second functionally addressed request that does 
not
result in a response (e.g., TesterPresent 
request) until at least 30 ms has elapsed after sending the first request. 
6. A tester shall wait a minimum of 30 ms after sending a functionally addressed request that does not result 
in a response before sending another functionally addressed request message. 
7. A tester can send a functionally addressed request message that does not result in a response (e.g., 
functional tester present) at any point in time during which the ECU is in the process of receiving or 
responding to a physically addressed diagnostic request. (In other words the functionally addressed tester 
present request may even interleave the transmission of frames of a multi-frame physical request 
message or a multi-frame physical response message.) 
8. A tester may also send a diagnostic physical request immediately following a diagnostic functional request 
as long as the functional request does not require a response. 
Table 7 provides an additional overview about the required handling in the tester also taking into consideration 
the node specific rules given in paragraph 4.3.2. The 

Download 8,35 Mb.

Do'stlaringiz bilan baham:
1   ...   23   24   25   26   27   28   29   30   ...   406




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish