5.1Appropriate technology 106 5.2Effective mainstreaming cross-cutting Issues (CCI) 108 5.3Institutional and management capacity (public and private) 109 5.4Policy support 112 6Monitoring and evaluation 117 6.1Definition of indicators (including indicators for CCI) 118 6.2Reviews / evaluation 119 7CONCLUSIONS and proposals 120 7.1Effort required for implementation of Water European Directives 121 7.2Support to institutional change 122 7.3Stakeholders involvement 123 7.4Reconstruction of system and capacity building 124 7.5Prospects and proposals 127
LIST OF FIGURES
LIST OF GRAPHS
LIST OF MAPS
List of Annexes
VOLUME 1: - ANNEXES in Main Text
Annex 1 Logical framework
Annex 4 Resources utilisation report 1 and 2
Annex 7 Result performance report
Annex 8 Detailed list of achievements compared to ToR and Inception Report requirements
Appendix 1: Dynamic plan for groundwater and flood risk assessment
Appendix 2: Administrative instruction on process, content, form and conditions of issuing water permits
Appendix 3: Report on a river basin management study tour to Germany and France
Appendix 4: PowerPoint Presentation - Final Project Steering Committee Meeting
Appendix 5: Minutes of Meeting of Final Steering Committee Meeting
VOLUME 2: ANNEXES - Manuals
Annex 10 Manual on basic ground water data acquisition
Annex 11 Manual on hydrology
Annex 12 Manual on flood risk mapping
Annex 13 User manual on WEAP model
Annex 14 User Manual on data catalogue
Annex 15 User manual on permit issuing database
Annex 16 User manual on water analyses database
Annex 17 User Manual on web portal
Annex 18 User manual on project web site
VOLUME 3: - ANNEXES - Technical Reports
Annex 19 Drini River Basin Characteristics - Hydrology
Annex 20 Drini River Basin Characteristics - Hydrogeology
Annex 21 Drini River Basin Characteristics - Biology
Annex 22 Technical Report on Water Information System
Annex 23 Technical Report on Groundwater
Annex 24 Technical Report on Drini River Basin hydrological study
Annex 25 Technical Report on WEAP modelling
Annex 26 Indicative Water Management Plan for Decani-Radoniqi water system
Annex 27 Flood risk report on the flooding zone of Skenderaj
Annex 28 Indicative Flood risk management Plan for Drini River Basin
List of Abbreviations
BAT
|
Best Available Technology
|
CIS
|
Common Implementation Strategy
|
DTM
|
Digital Terrain Model
|
EAR
|
European Agency for Reconstruction
|
ECLO
|
European Commission Liaison Office
|
EU
|
European Union
|
EU-WFD
|
European Union – Water Framework Directive
|
FIDIC
|
Fédération Internationale des Ingénieurs-Conseils
|
GIS
|
Geographical Information System
|
GTOPO30
|
A global Digital Elevation Model (DEM)
|
GWB
|
Ground Water Body
|
HMIK
|
Hydro-Meteorological Institute of Kosovo
|
ICMM
|
Independent Commission for Mines and Minerals
|
JSTE
|
Junior Short-term Expert
|
KCA
|
KOSOVO Cadastre Agency
|
KE
|
Key Expert
|
KEPA
|
KOSOVO Environmental Protection Agency
|
KTA
|
KOSOVO Trust Agency
|
KIRP
|
KOSOVO Irrigation Rehabilitation Project
|
LTE
|
Long-term Expert
|
LF
|
Logical Framework
|
MEA
|
Multilateral Environmental Agreements
|
MAFRD
|
Ministry of Agriculture, Forestry and Rural Development
|
MPS
|
Ministry of Public Services
|
MESP
|
Ministry of Environment and Spatial Planning
|
MTI
|
Ministry of Trade and Industry
|
OCR
|
Optical Character Recognition
|
ODBC
|
Open Database Connectivity
|
PCU
|
Project Coordination Unit
|
PS
|
Permanent Secretary
|
SCM
|
Steering Committee Meeting
|
QPR
|
Quarterly Progress Report
|
RBDA
|
River Basins District Authorities
|
SDTS
|
Spatial Data Transfer Standard
|
SSTE
|
Senior International Short-term Expert
|
TA
|
Technical Assistance
|
TL
|
Team Leader
|
ToR
|
Terms of Reference
|
UWWD
|
Urban Wastewater Directive
|
WD
|
Water Department
|
WFD
|
Water Framework Directive
|
WWRO
|
Water and Waste Regulatory Office
|
WWTP
|
Waste Water Treatment Plant
|
Do'stlaringiz bilan baham: |