Page/iv    ABBREVIATIONS



Download 2,52 Mb.
Pdf ko'rish
bet3/10
Sana20.05.2023
Hajmi2,52 Mb.
#941426
1   2   3   4   5   6   7   8   9   10
Bog'liq
kavre wsp report

Page/iv 
 
ABBREVIATIONS 
HDPE
High Density Polyethylene pipe 
GI
Galvanized Iron 
LC 
Light Class 
MC 
Medium Class 
HC 
High Class 
LPCD
Liter per capita per day 
LPS 
Liter per second 
D/S 
Downstream 
W/S 
Water Supply 

meter 
cm
Centimeter 
mm 
millimeter 
m
2
square meter 
m
3
cube meter 
RCC 
Reinforced cement Concrete 
FC 
Ferro cement 
Kg 
Kilogram 
KVA
Kilovolt Ampere 

Volts 

Ampere 

Watts 
Kw 
Kilowatts 
Hp 
Horsepower 


Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
 
Page/v 
 
SALIENT FEATURES 
General Information 
Project Name: 
Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
District:
Kavre
Local Body: 
Mandan Deupur Municipality
Ward no:

Name of villages served: 
Gairisamara, Thakurigaun, Kafleni, Naldum, Nayagaun, Mahankal-

and 
II 
and 
Dadhegaun 
communities 
of 
Mandan 
DeupurMunicipality. 
Design period: 
15 years 
Population Growth Rate: 
0.64% per annum 
Name of road and Road Head: 
Nagarkot-Higuwapati Road 
Kuntabesi to Project site: 20kms road (12kms earthen and 8kms 
metallic road) 
Design Information 
Name of Source: Cha Khola
Type of intake: Sump well located at Tribeni 
 
Transmission Line: 
No. of stages from intake to main RVT:

No of pumps in 1
st
stage: 
3(20HP, 50 KVA transformer)
 
Pump discharge in 1
st
stage:
9.52 lps (3 pumps combined) 
No of pumps in 2
nd
stage: 
3(
20HP, 50 KVA transformer

Pump discharge in 2
nd
stage:
9.52 lps (3 pumps combined) 
No of pumps in 3
rd
stage: 
2(10 HP, 50 KVA transformer)
 
Pump discharge in 3
rd
stage:
6.75 lps (2 pumps combined) 
GI Pipe line design length: 
2717 m of various sizes and classes (from 
intake to Main RVT) 


Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
 
Page/vi 
 
Dynamic Head
318.03m (from intake to Int. RVT-1) 
+332.13m (from Int RVT-1 to Int. RVT-2) 
+ 124.76m (from Int. RVT-2 to main RVT) 
Distribution Line: 
No. of clusters:

Total households and population served:
355 HH and 2007 people 
Forecasted population:
2208 
Total hotels served: 
55 bedded and 15 non-bedded hotels 
Total schools served: 

Total health posts served: 
1
Main Service Reservoirs: 
2 (main-75m3 and Int. RVT-2-35m3 
capacity) 
Other reservoirs: 
7(5 new and 2 existing) for each cluster 
Total pipe line design length (Distribution): 
32,087 m HDPE pipe of various sizes and 
series 
No of distribution chamber: 

No. of Break Pressure Tank: 

No of crossings: 
23(2 suspended and 21 stream crossing) 
Type of connection: 
Private (460 private connections) 
Total cost of the project: 
Rs. 94,739,369.6
 
Recommendations: 
Technically, economically and socially 
feasible 


Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
 

Download 2,52 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   10




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish