Complete draft report of ramechhap pvps



Download 2,52 Mb.
Pdf ko'rish
bet1/10
Sana20.05.2023
Hajmi2,52 Mb.
#941426
  1   2   3   4   5   6   7   8   9   10
Bog'liq
kavre wsp report



 
 
Office of the Municipal Executive 
Mandan Deupur Municipality-2 
Kuntabesi, Kavre 
Bagmati Province, Nepal 
 
Detail Project Report Preparation of 
Sathikuriwa Luwagaun Chittekhola Brihat Lift Water Supply Project
 
Mandan Deupur Municipality-2, Kavre
Ink Consult (P 
Ink Consult (P) Ltd.
 
Chakupat, Lalitpur 
 
Tel No: +977-01-5260138 
 
Email: info@inkconsult.com.np 
SUBMITTED BY 
 
 


Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
 
Page/i 
 
ACKNOWLEDGEMENT 
We wish to record our appreciation for all the persons who helped us in the site and the office while 
preparing this report. We are grateful to the local community in Nagarkot for providing us the detailed socio-
economical and environmental information about the site and helping in the survey work. Also, we would 
like to express our gratitude to Mandan Deupur Municipality, Kavre for believing in us as capable for the 
consulting services of the project. Furthermore, we would also like to thank the authors and publishers of all 
the books, manuals, reports and research papers we read for the preparation of this report. 
 
 
 


Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP 
 
Page/ii 
 
EXECUTIVE SUMMARY 
This report contains the detailed report of "
Sathikuriwa Luwagaun Chittekhola Brihat Lift WSP
" carried by 
Ink Consult Pvt. Ltd., Chakupat, Lalitpur, Nepal. The proposed project is located in Mandan Deupur 
Municipality-2, Kavre district. It lies in the Bagmati Province of Nepal. The project site extends over a large 
area and covers the 
Gairisamara, Thakurigaun, Kafleni, Naldum, Nayagaun, Mahankal-I and II and 
Dadhegaun 
communities. The nearest road is Nagarkot-Higuwapati roadway from the project site. The area 
mostly consists of hotel areas and some residential areas. The majority of the population of this area depends 
upon tourism and agriculture.
Regarding the technical features of the project, water from the source 
Cha khola
is diverted into the intake 
and pumped through electrical pumps in multiple stages. There are three staged pumps which finally convey 
water up to the main reservoir tank. The distribution is done through Intermediate RVT-2 located at 1940 
meters amsl and main reservoir tank located at 2055 meters amsl. Intermediate RVT-2 will facilitate the 
areas of 
Gairisamara, Thakurigaun, Kafleni, Naldum 
and
 Dadhegaun 
whereas the main reservoir tank will 
facilitate the areas of 
Nayagaun 
and
 Mahankal-I and II.
The total project cost is estimated to be 

Download 2,52 Mb.

Do'stlaringiz bilan baham:
  1   2   3   4   5   6   7   8   9   10




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish