World Bank Document


CPS CLR ANNEX 1: RESULTS MATRIX



Download 0,6 Mb.
Pdf ko'rish
bet138/174
Sana31.12.2021
Hajmi0,6 Mb.
#218090
1   ...   134   135   136   137   138   139   140   141   ...   174
Bog'liq
Uzbekistan-Country-partnership-framework-for-the-period-FY16-20

CPS CLR ANNEX 1: RESULTS MATRIX 

 

CPS Outcome  

Status and Evaluation 

Summary 

Lending and Non-

Lending Activities 

that contributed to 

the outcome 

Lessons and Suggestions 

for the new CPF 

STRATEGIC THEME I. IMPROVING ENERGY INFRASTRUCTURE AND WATER RESOURCE 

MANAGEMENT 

National Priorities:  Energy efficiency; improved environmental management; private sector development; 

Improved water use. 



Issues and Obstacles:  Energy: low quality of electricity supply; high-energy usage per unit of GDP productivity; 

high losses in supply chain; lack of private investment; double-landlocked nature of Uzbekistan affects its 

competiveness; inefficient use of water resources for irrigation; inadequate meteorological, climate, and 

hydrological information for decision making. 

Improved energy sector 

reliability as seen through 

reduction of outages in 

South West Uzbekistan.  

 

Baseline: 92 hours per 

year 


Target: 48 hours per year

and Government adoption 

of strategic plan for the 

energy sector. 



Achieved: Construction of 

218 km of 500kV 

transmission line 

connecting Talimarjan 

Power Plant with Sogdiana 

substation and transmission 

line Guzar-Karakul was 

completed. Electricity 

outages reduced from 92 to 

48 hrs. At the level of the 

strategic plan for energy 

sector, WBG provided 

significant advice through a 

number of analytical and 

sector works. 

 

IFC Investment: A 

Mandate Letter was 

submitted to Uzelectroset 

Company in October 2014. 

However, based on the 

worsening of the financial 

situation of the power 

sector of in Uzbekistan, 

IFC and the Government 

decided to put this project 

on hold (amounts of 

accounts 

receivables/accounts 

payables significantly 

increased and important 

investments were required). 

Lending: Talimarjan 

Transmission Project 

03/15/2011-

12/31/2015 (S/S) 

Advanced Electricity 

Metering Project 

03/27/2012 – 

06/30/2017 (MU/MS). 




Download 0,6 Mb.

Do'stlaringiz bilan baham:
1   ...   134   135   136   137   138   139   140   141   ...   174




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2025
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish