Unit 3: analysis of automated flow line & line balancing general Terminology & Analysis



Download 211,11 Kb.
Pdf ko'rish
bet16/20
Sana10.07.2022
Hajmi211,11 Kb.
#769762
1   ...   12   13   14   15   16   17   18   19   20
Bog'liq
mechanical engineering computer-integrated-manufacturing-systems analysis-of-automated-flow-line-line-balancing notes

www.getmyuni.com
18


= $1.37/min 
C
pc
= 1.67(0.61) = $0.836 / pc 
Even though the line would be more expensive to operate per unit time, the proposed 
chage would increase production rate & reduced piece cost. 
Storage Buffers: 
The preceding analysis assumes no buffer storage between stations. When 
the automated portion of the line breaks down, the manual stations must also stop for 
lack of work parts (either due to starving or blocking, depending on where the 
manual stations are located relative to the automated stations). Performance would 
be improved if the manual stations could continue to operate even when the 
automated stations stop for a temporary downtime incident. Storage buffers located 
before & after the manual stations would reduce forced downtime at these stations. 
Problem On Storage Buffers on a Partially Automated Line: 
 
Considering the current line in the above example, suppose that the ideal cycle time 
for the automated stations on the current line 
Tc
= 18 sec. The longest manual time is
30 sec. Under the method of operation assumed in the above example both manual & 
automated stations are out of action when a breakdown occurs at an automated 
station. Suppose that storage buffers could be provided for each operator to insulate 
them from breakdowns at automated stations. What effect would this have on 
production rate & cost per piece? 
Solution: 
Given 
T
c
= 18sec = 0.3min, the average actual production time on the automated 
stations is computed as follows: 
T
p
= 0.30 + 6(0.01)(3.0) = 0.48min 
Since this is less than the longest manual time of 0.50, the manual operation could 
work independently of the automated stations if storage buffers of sufficient capacity 
were placed before & after each manual station. Thus, the limiting cycle time on the 
line would be
T
c
= 30sec = 0.50 min, & the corresponding production rate would be: 
R
p

R
c
= 1/0.50 = 2.0pc/min
= 120.0 pc/hr 
Using the line operating cost from the previous example, 
C
o
= $1.32/min, we have a 
piece cost of 
C
pc
= 1.32 (0.50) = $0.66 / pc 
Comparing with the previous example, we can see that a dramatic improvement in 
production rate & unit cost is achieved through the use of storage buffers. 

Download 211,11 Kb.

Do'stlaringiz bilan baham:
1   ...   12   13   14   15   16   17   18   19   20




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish