a defect or a risk. A root cause may underlie more than one variance or defect or risk.
Schedule.
See project schedule and schedule model.
Schedule Baseline.
A technique used to shorten the schedule duration without reducing the project scope.
The collection of information for describing and controlling the schedule.
��
722
Part 3 - Glossary
Schedule Forecasts.
Estimates or predictions of conditions and events in the project’s future based on information and
knowledge available at the time the schedule is calculated.