Vocabular y 4 Complete these phrases.
1 a roll of-packets
2 a box of banana
3 a bag of sand
4 a cup of tea
a packet of. Pop corn
a bottle of mineral water _
a tin of tuna
8 a flask of wine
Writing 1 Put these phases of bridge construction in the correct orde r 1-7. _|
foundations __ pier construction site preparations _] deck I | opening ceremony superstructur e __ design
1-design
2-site preparations
3-foundations
4-pier construction
5-superstructure
6-deck
7- opening ceremony
2 Complete this conversation about a bridge project. Writ e one or tw o words in each gap.
A: So, when will they start the design phase?
In November. The whole project (1) will take about 24 months .
I see. What sort of bridge (2) it be?
It (3)is a simple beam bridge. B A: B: A: B: A B A B
And how (4)LENGTH. wil l it be?
I think the overall length will be 300 metres. But I'm not sure. (5)I . have t o check.
So it'will be (6)longer than the other bridge?
Yes, that's right. OK.
How many piers will it (7) have _? Three?
No, the civil engineer says that two piers are (8) . .enough
EX 3 P-67
4 Writ e these dates in words .
1 3 Oct 1992-THIRD OCOTBER OF NINETEEN NINETY TWO
3 16 Mar 2010-SIXTEENTH MARCH OF TWENTY AND TEN
2 24 Feb 2001-TWENTY FOURTH OF TWO THOUSAND AND ONE
4 12 Apr 1987-TWELVE APRIL OF NINETEEN AND EIGHTEEN SEVEN
5 Writ e these times in words
1-THREE THIRTY OR HALF PAST THREE
2-FOUR TWENTY OR TWENTY PAST FOUR
3-SIX TWENTY FIVE
4-FIVE PAST NINE
5-A QUARTER TO TWELVE
6-A QUARTER PAST SEVEN
6 Are these questions correct (C) or incorrect (I)? Correct the mistakes.
1 How much bags of cement? (C )
4 How many projects? (C / I)
2 How many litres of water? C
5 How much sand? (C)
3 How much metres? ( I) 3 – How many metres
Ex 7 p 68
We started a project of this bridge on July of 2009 and have already finished it in September of this year.in northern Germany .So our client is government it is being very difficult to control traffic jam in Mill way main street in rush hours .So we decided to build a beam bridge among the crossroad .Our beam bridge will have 3 piers the length of our bridge 46 metres and width is 24m.The main materials we needed are steel and concrete.In our project is shown that the main point of our bridge would be 54 metreshigh.Let me to show you our project schedule
|
sep
|
Oct
|
Nov
|
Dec
|
Jan
|
Feb
|
March
|
April
|
may
|
Jun
|
Jul
|
Aug
|
Sep
|
Oct
|
Nov
|
|
|
Design
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Side preparations
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foundations
|
|
|
|
|
|
+
|
+
|
+
|
|
|
|
|
|
|
|
|
|
Pier construction
|
|
|
|
|
|
|
|
|
+
|
+
|
+
|
|
|
|
|
|
|
Superstructure
|
|
|
|
|
|
|
|
|
|
|
|
+
|
+
|
+
|
+
|
|
|
Deck
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Opening ceremony
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This diagram provides you the information about our datelines. So our building company is going to open this bridge in November of 2010.