Страница 1 мировой engineering стандарты общая спецификация


Node Verification Procedure



Download 1,29 Mb.
Pdf ko'rish
bet241/435
Sana02.08.2022
Hajmi1,29 Mb.
#846314
1   ...   237   238   239   240   241   242   243   244   ...   435
Bog'liq
WORLDWIDE ENGINEERING STANDARDS General Motors Local Ar

8.15.7 Node Verification Procedure.
Procedure 1:
1. Request message length test: Send a physically addressed TesterPresent ($3E) request message with an
invalid message length (not equal to 1) and verify that a negative response message with response code
$12 is sent by the node (ECU).
--``,,``````,``,,``,,,`,`,`,,-`-`,,`,,`,`,,`---
Page 178
GM WORLDWIDE ENGINEERING STANDARDS
GMW3110
Procedure 2:
1. Send a service request message which requires a TesterPresent service to remain active (excluding


25.06.2020
WORLDWIDE ENGINEERING STANDARDS General Motors Local Area Network Enhanced Diagnostic Test Mode Specification
https://translate.googleusercontent.com/translate_f
158/298
© Copyright 2010 General Motors All Rights Reserved
February 2010
Page 178 of 336
service $A5).
2. Send functionally addressed TesterPresent ($3E) request messages with an invalid message length (not
equal to 1) and verify that no negative response message is sent by the node (ECU).
3. Verify that the node (ECU) sends a ReturnToNormalMode positive response message between P3

and
P3
Cmax
.
Procedure 3: 
(Uses Functional TesterPresent message).
1. Send a service request message to the node using a service that requires a TesterPresent to keep its
functionality active (e.g., schedule periodic DPID via $AA service or use DeviceControl $AE service). Pick
a service where it can be easily verified that the functionality remains active if TesterPresent messages are
sent.
2. Wait 2 s.
3. Send a valid functionally addressed TesterPresent ($3E) request message using the AllNodes CANId
($101) + AllNodes extended address ($FE).
4. Verify that no TesterPresent positive response message is sent by the node (ECU).
5. Send no further messages and wait for a P3

timeout to occur. Verify that the node (ECU) sends a
ReturnToNormalMode positive response message between P3
C
and P3
Cmax
. Also verify that the
functionality of the other service has stopped once the ReturnToNormalMode positive response message
has been sent.

Download 1,29 Mb.

Do'stlaringiz bilan baham:
1   ...   237   238   239   240   241   242   243   244   ...   435




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish