S.No.
|
Project
|
Dead Line
|
Page no
|
|
WATER
|
|
|
1
|
Works Execution of Šibenik Wastewater Investment Programme, Croatia
|
12 April 2014
|
11
|
2
|
Package 04: Construction of Irrigation System in Van Ban district, Lao Cai Province (26/GTXD), Vietnam
|
26 March 2014
|
14
|
3
|
CTWRP-011 - Construction Of Water Main And Replacement Of Distribution Network In Tursunzoda City, Lot 1, Tajikistan
|
10 April 2014
|
16
|
4
|
North Main Canal and Structures from Km 24+800 to Km 29+500, Vietnam
|
03 April 2014
|
18
|
5
|
YAKUTSK WATER MODERNISATION PROJECT, Russian Federation
|
11 Feb 2015
|
20
|
6
|
Osh Water And Wastewater Rehabilitation Project, Kyrgyzstan
|
13 Feb 2015
|
21
|
7
|
JALAL-ABAD WATER REHABILITATION PROJECT, Kyrgyzstan
|
13 Feb2015
|
22
|
8
|
Greater Beirut Water Supply Project, Lebanon
|
10 April 2014
|
23
|
9
|
NORTH WESTERN REGIONAL WASTE WATER PROJECT, Croatia
|
10 Feb2015
|
24
|
10
|
SUBOTICA WATER UPGRADE, Serbia
|
10 Feb2015
|
|
11
|
Lebanon: Water distribution networks
|
10 April 2014
|
26
|
12
|
Kuwait: Water pipelines
|
15 April 2014
|
26
|
13
|
Kuwait: Seawater outlet area deepening
|
23 March 2014
|
27
|
14
|
Qatar: Sewer works
|
25 March 2014
|
28
|
|
SOCIAL INFRASTRUCTURE
|
|
|
15
|
CSTB No. 2947 “RE-TENDER” Improvement and Long Term Performance Based Maintenance Services for the Kotna – Lampramp Road, Papua New Guinea
|
07 April 2014
|
29
|
16
|
CSTB No. 2948 “RE-TENDER” Improvement and Long Term Performance Based Maintenance Services for the Mendi – Tambul Road, Papua New Guinea
|
07 April 2014
|
31
|
17
|
Procurement of Works for Construction of Chah-e-Anjir to Gereshk Road Project (31.6 km), Afghanistan
|
08 April 2014
|
34
|
18
|
Procurement of Works for Reconstruction and Rehabilitation of Sharan-Angor Ada Corridor, Afghanistan
|
09April 2014
|
35
|
19
|
Upgrading and Maintenance of Dili-Ainaro Road, Timor Liste
|
04 April 2014
|
37
|
20
|
HY2/NCB - Hung Yen Old Town Infrastructure (Upgrading Infrastructure of Pho Hien Ancient Street), Vietnam
|
28 March 2014
|
39
|
21
|
Update: Civil Works for Rehabilitation and Restoration of Prahova Tribunal, Romania
|
14 April 2014
|
40
|
22
|
Package 07: Construction work + Insurance + Traffic Safety (30/GTXL) (Subproject: Upgrading Rural Road Yen Luong – Thuong Cuu, Thanh Son District, Phu Tho Province), Vietnam
|
17 March 2014
|
42
|
23
|
HY2/NCB - Hung Yen Old Town Infrastructure (Upgrading Infrastructure of Pho Hien Ancient Street), Vietnam
|
28 March 2014
|
44
|
24
|
Saudi Arabia: Schools
|
30 March 2014
|
45
|
25
|
Saudi Arabia: City centre development
|
08 April 2014
|
46
|
26
|
Egypt: Housing construction (252)
|
02& 03 April 2014
|
46
|
27
|
Kuwait: Road and infrastructure works
|
25 March 2014
|
48
|
28
|
Saudi Arabia: Buildings and facilities
|
23 March 2014
|
48
|
29
|
Kuwait: Building O&M
|
01 April 2014
|
49
|
30
|
Kuwait: Road maintenance
|
06 April 2014
|
49
|
31
|
Kuwait: Road maintenance
|
30 March 2014
|
50
|
32
|
Kuwait: Swimming pool complex
|
25 March 2014
|
50
|
33
|
Kuwait: Building construction and maintenance
|
25 March 2014
|
51
|
|
ENERGY
|
|
|
34
|
Procurement of Plant -Design, Supply and Install for Package 2: Construction of 132 kV Transmission Infrastructure, Sri Lanka
|
02 April 2014
|
52
|
35
|
Procurement of Plant - Design, Supply and Install for Package 1: Mannar Transmission Infrastru - Lot B: Constn of New Anuradhapura to Vavuniya 55km, double circuit, two Zebra, 132kV transmission line and Vavuniya to Mannar 70km, double circuit, Sri Lanka
|
02 April 2014
|
54
|
36
|
Tender A: Change of 10 Substations' Power-Transformers 110/ 35/ 10 kV and Reactors 400 kV, Moldova
|
18 March 2014
|
55
|
37
|
Procurement of Design, Engineering, Procurement, Supply, Installation, Commissioning and Testing of two nos. Glycol Dehydration Type Gas Process Plant, Bangladesh
|
23 March 2014
|
57
|
38
|
Implementation of Energy Efficiency Measures in Twenty Six (26) Public Buildings, Bulgaria
|
28 March 2014
|
59
|
39
|
EPC of Divune Hydropower Project [A sub project within Town Electrification Investment Program], Papua New Guinea
|
11 April 2014
|
62
|
40
|
Energy Efficiency Project, Bosnia and Herzegovina
|
Not Specified
|
64
|
41
|
Kuwait: Secondary transformer stations
|
15 April 2014
|
65
|
42
|
Kuwait: Transformer stations and overhead lines
|
20 May 2014
|
66
|
|
CONSULTANCY
|
|
|
43
|
Consultancy Services for The Preparation Of An Integrated Management Plan For Cuanza River Basin¸ Angloa
|
25 March 2014
|
67
|
44
|
Construction Supervision and Contract Management – Component 1 – Phase 2 (20 LIAs), Vietnam
|
17 March 2014
|
68
|
45
|
Feasibility Study and Detail design of Improvement of Kathmandu Naubise Mugling Road, Construction Supervision of Improvement of Narayanghat-Mugling Road and Road Safety Audit of Kathmandu-Birgunj Corridor, Nepal
|
24 March 2014
|
69
|
46
|
Consulting Services for Preliminary Designs and Preparation of Procurement Documents for Design and Build Contract for Micro Tunnelling and Appurtenant Structures, Sri Lanka
|
25 March 2014
|
70
|
47
|
Corridor Study and Pre-Feasibility Study for new highway section between Amran and Saada (border) – 290 km, Yemen
|
27 March 2014
|
72
|
48
|
Oman: Construction services
|
28 March 2014
|
73
|