Introduction to Satellite Communication 3rd Edition


Earth Station Economics



Download 9,96 Mb.
Pdf ko'rish
bet300/323
Sana01.07.2022
Hajmi9,96 Mb.
#726091
1   ...   296   297   298   299   300   301   302   303   ...   323
Bog'liq
ebooksclub.org Introduction to Satellite Communication Artech House Space Applications

12.5
Earth Station Economics
The ideal way to evaluate the economics of an Earth station is to identify each
major element and relate its cost to technical performance. Such a detailed approach
gives assurance of realism in determining network cost even if the implementing
organization purchases complete stations from a contractor. Purchase of stations
on a turn-key basis means that the contractor designs, installs, and tests the complete
station and simply turns the door keys over to the buyer. That approach can be
taken on an entire network, a single station, or one or more major elements of a
station. An alternative approach that puts more control in the hands of the system
operator is to build up an internal staff of engineers and installation people who
can procure the individual elements and then perform the integration themselves.
There is a cross-over, above which the fixed cost of maintaining such a group can
be justified because of the more stable workload placed on them. Below that cross-
over, there simply is not enough work to keep the group sufficiently busy with
useful technical assignments and project work.
A proper network design analysis and optimization must consider the relation-
ship between the performance of the Earth stations and that of the space segment.
This brings into play the requirements of the microwave links to and from the
satellite and the technical parameters of modulation and multiple access, reviewed
in Chapters 4 and 5, respectively. For an existing GEO satellite, the price of using
the space segment could be determined by contacting the marketing staff of the


408
Satellite Systems Engineering and Economics
satellite operator, or, if available, a broker. The analysis, therefore, is simplified
because the satellite technical parameters and associated costs are givens. The case
in which a new satellite is to be designed as part of the exercise is beneficial because
the characteristics of the satellite can vary along with those of the ground stations.
As discussed later in this chapter, there are useful tradeoffs that can help define
an optimum space segment design that provides the desired capability for the least
cost.

Download 9,96 Mb.

Do'stlaringiz bilan baham:
1   ...   296   297   298   299   300   301   302   303   ...   323




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish