RUN @ RATE GP-9 -- RUN @ RATE WORKSHEET



Download 80,5 Kb.
bet10/14
Sana12.01.2022
Hajmi80,5 Kb.
#337930
1   ...   6   7   8   9   10   11   12   13   14
Bog'liq
GP-9

RUN @ RATE GP-9 -- RUN @ RATE WORKSHEET

ATTACHMENT B


Supplier Name: _________________________________ Part Number(s):___________________________
RUN @ RATE REVIEW CONTENT

The Run @ Rate will verify that the results of the supplier’s actual manufacturing process meet customer requirements for on-going quality, as stated in PPAP, and quoted tooling capacity. Also it will verify that the supplier's actual process is to plan, as documented in PPAP, GP-12 and the other documentation listed below.


During the Run @ Rate, the following will be reviewed: documentation; the manufacturing process and results; part quality requirements and results; sub-supplier requirements and Run @ Rate results and packaging.
A. Documentation

At the time of the Run @ Rate, the following support documentation should be available for review:

Available Y/N

1. PPAP package including: 1.______

a) process flow diagram a._____

b) process control plan, with reaction plan b._____

c) DFMEA/PFMEA c._____

d) Master part(s) d._____

2. GP-12 (Pre-launch Control) plan 2.______

3. Tool capacity information 3.______

4. Operator/inspection instructions 4.______

5. Prototype/pilot concerns (PR/R's) 5.______

6. Sub-contractor control/capacity data 6.______

7. Sub-contractor material schedules and transportation 7.______

8. Packaging/labeling plan 8.______

9. Acceleration plan 9.______



Note: All documentation must be complete and correct.

B. MANUFACTURING PROCESS -- ACTUAL TO PLAN



  1. Is the product being manufactured at the production site using the production tooling, gaging, process, materials, operators, environment, and process settings? Yes _____No _____

C omments:_______________________________________________________________________________

________________________________________________________________________________________



  1. Does the actual process flow agree with the process flow diagram, as documented in PPAP? (Review the facility plan and layout. Walk the process with the flow diagram.) Yes _____No _____

Comments:_______________________________________________________________________________

________________________________________________________________________________________



  1. Are operator instructions/visual controls available and adhered to at each work station?
    Yes _____ No _____ Comments:_____________________________________________________________

________________________________________________________________________________________

  1. I s all in-process documentation, such as process control charts, in place at the time of the Run @ Rate? Is the documentation utilized to drive a defined reaction plan and corrective action process?
    Yes_____No_____Comments:_______________________________________________________________

________________________________________________________________________________________

5. When required, are production boundary samples available at required work stations? Are the boundary samples approved by GM? Yes _____No _____ Comments:_______________________________________

________________________________________________________________________________________

6. Are maintenance plans in place? Are repair and maintenance parts available? Is there planned downtime for preventative maintenance? Yes _____No _____ Comments: _______________________________________

________________________________________________________________________________________
Note: All of the preceding requirements must be met to pass the Run @ Rate.
Attachment B to GM-1960 GM-1965 (2/95)


Download 80,5 Kb.

Do'stlaringiz bilan baham:
1   ...   6   7   8   9   10   11   12   13   14




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish