P general motors supplier development general procedure


Note: The total number of parts produced, the pieces rejected and the pieces reworked must be documented on the summary sheet



Download 80,5 Kb.
bet13/14
Sana12.01.2022
Hajmi80,5 Kb.
#337930
1   ...   6   7   8   9   10   11   12   13   14
Bog'liq
GP-9

Note: The total number of parts produced, the pieces rejected and the pieces reworked must be documented on the summary sheet.

  1. Do the parts produced off production tooling during the Run @ Rate meet GM's requirements for

o n-going quality, as stated in PPAP? Yes _____No _____ Comments: _____________________

______________________________________________________________________________


2. Is the manufacturing process in control? Yes _____No _____ Comments: ___________________

______________________________________________________________________________


3. Does the manufacturing process demonstrate the required capability? Yes _____No _____
Comments: _____________________________________________________________________

_______________________________________________________________________________


4 . Is the process control plan sufficient to effectively meet the design record requirements, i.e., control points, frequency of checks, etc.? Yes _____No _____ Comments: _________________________

_______________________________________________________________________________




  1. Nonconformances

a) Were the non-conformances yielded by the process identified by the normal PPAP control plan?

Yes _____ No _____ If identified by the GP-12 Process Control Plan or an activity outside documented plans, corrective action is required.



  1. Did the PFMEA identify the potential failure modes? Yes _____ No _____ If not, the PFMEA needs to be updated and corrective action put in place.

  2. Do all the observed rework and repairs effectively correct the nonconformance(s)?

Yes _____ No _____

  1. Are there any open concerns from prototype or pilot (PR/R)? Yes _____ No _____

Comments: _________________________________________________________________

___________________________________________________________________________


Note: All of the preceding requirements must be met to pass the Run @ Rate.

Attachment B to GM-1960 GM-1965 (2/95)




Download 80,5 Kb.

Do'stlaringiz bilan baham:
1   ...   6   7   8   9   10   11   12   13   14




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish