Краткое содержание отчета по экологической оценке Проекта по уст ойчивом у управлению т верды м и от ходами



Download 3,95 Mb.
Pdf ko'rish
bet80/93
Sana06.07.2022
Hajmi3,95 Mb.
#743586
TuriКраткое содержание
1   ...   76   77   78   79   80   81   82   83   ...   93
Bog'liq
по экологической оценке Проекта по устойчивому управлению твердыми отходами

Mitigation measures
1. All requirements of national OHS procedures have to be fully implemented in 
service centers;
2. All workers and staff have to be trained on OHS.
362. 
During the project operation stage, negative impacts and risks may therefore take 
place. However, all of them can be mitigated by the implementation of proposed measures 
described in the EMP, and required by national legislation. Along with this, the positive impact 
of the project is obvious, and it is well described in the section relating to the project goals 
and expected outcomes. Detailed information about impacts, recommended mitigation 
measures, responsible personnel for EMP implementation, and monitoring with cost 
estimates for these activities are presented in Chapter 9.
106


6.
INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION
363. 
One of the main goals of the IEE is to facilitate the participation of all stakeholders 
and local communities at all stages of the project cycle: from the pre-construction phase and 
construction activities to its operation. In these regards, public consultations were held in all 
13 project districts to capture the stakeholders’ opinions about the project, and agree on the 
project activities.
364. 
In compliance with ADB requirements with the aim of informing the communities in 
the project area about the upcoming consultations, the announcements on planning 
consultation were submitted to the Toza Hududs for each province and the Republic of 
Karakalpakstan the official letters under the State Committee on Ecology and Environmental 
Protection. In addition, all directors of Toza Hududs involved to the project, were informed 
about planning activities (Appendix 4).
365. 
Among consulted stakeholders were specialists of district level Toza Hudud, 
provincial branches of State Committee on Ecology and Environment Protection, specialists 
from provincial and district level of khokimiyats, representatives of makhallas where 
construction works will be implemented.
366. 
Issues on buffer zones for service centers was discussed with specialists from 
Tashkent city’s branch and national level of Sanitarian and Epidemiological Service. Existing 
status of environmental monitoring of landfills, operating equipment and demands in further 
improvement of environmental base of State Committee on Ecology and Environment 
Protection (SCEEP) was discussed with Center of Analytical Control of SCEEP, Central 
Department of Environmental Monitoring under SCEEP and representatives of SCEEP on 
provincial level.
367. 
During public consultations on the project sites PPTA’s consultants presented 
information about the project, planning activities under the project, anticipated environmental 
impacts and grievance redress mechanism. The PPT presentations were followed by 
discussions with meetings’ participants, questions and answers sessions.
368. 
Brief information on questions raised by participants during the public consultations 
is presented in Table 37.
Table 37: B rie f S um m ary o f P u b lic C o n s u lta tio n s
Issues raised
Addressed in IEE
Syrdarya Province, administrative building of Ulugobod RCA, August 8, 2019
The Toza Hudud needs more technical 
support (transports) - Recommendation
Recommendations
Is it possible to build a hotel for the staff? 
Because some workers (drivers) could not 
come back without cars and technics
No service center design does not include facility 
for overnight staying.
Will a design of service center include 
workshops or only administration buildings?
Yes, the design will include workshops to provide 
maintenance for purchased under the project 
trucks
Will the project include special technics or 
not?
Yes, the project will include purchase of special 
techniques: 13 excavators, 13 flatbed trucks, and 
13 mobile service vehicles
107


To provide efficient service Toza Hudud 
needs more containers
Under the project purchase of 6,000 bins are 
planned. These bins will be equivalently 
distributed among regional Branches of Toza 
Hudud
Jizzakh province, administrative building of Bogishamol MFY on August 8, 2019
When the project will start?
It is planning that project will start in first quarter 
2020
Service centers’ design and construction 
works should be done in accordance with 
international standards (recommendation)
Conceptual 
design 
was 
prepared 
with 
consideration international standards. For civil 
works ADB procurement requirements will be 
applied
Will it be possible for local Contractors to 
Download 3,95 Mb.

Do'stlaringiz bilan baham:
1   ...   76   77   78   79   80   81   82   83   ...   93




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish