Introduction to Health and Safety at Work


Figure 17.2 Schedule 1 of CDM2007 Particulars to be  notifi ed to the HSE. Summary of the main legal requirements



Download 5,86 Mb.
Pdf ko'rish
bet526/722
Sana20.07.2022
Hajmi5,86 Mb.
#825654
1   ...   522   523   524   525   526   527   528   529   ...   722
Bog'liq
introduction to health safety at work

Figure 17.2
Schedule 1 of CDM2007 Particulars to be 
notifi ed to the HSE.
Summary of the main legal requirements
327


Introduction to Health and Safety at Work
328
prefabricated elements which, immediately before 
such disassembly, formed a structure
(d) The removal of a structure or of any product or 
waste resulting from demolition or dismantling of 
a structure or from disassembly of prefabricated 
elements which immediately before such disassem-
bly formed such a structure, and
(e) the installation, commissioning, maintenance, repair 
or removal of mechanical, electrical, gas, com-
pressed air, hydraulic, telecommunications, com-
puter or similar services which are normally fi xed 
within or to a structure.
This means that there are some things which may take 
place on a construction site, like tree planting and horti-
culture work, putting up marquees, positioning lightweight 
panels in an open plan offi ce and surveying, which are 
not construction work.
Domestic clients are people who have work done 
on their own home or the home of a family member, that 
does not relate to a trade or business whether for profi t or 
not. Where an insurance company arranges construction 
work to be done on a domestic dwelling the insurance 
company becomes the client for the purposes of CDM. If, 
however, the insured arranges the work and is reimbursed 
by the insurance company then the insured is the client.
As with all projects, designers and contractors 
working for domestic clients will have to be competent 
and take reasonable steps to ensure that anyone they 
arrange for, or instruct, to manage, design or construct 
work is also competent. They will also have to co-operate 
with others involved in the project, to safeguard the 
health and safety of everyone involved. When preparing 
or modifying a design, designers will have to avoid risks 
to the health and safety of anyone constructing, maintain-
ing, using or demolishing the structures concerned, by 
removing the hazards (and reducing the risks arising from 
any that remain). Contractors will have to plan, manage 
and monitor their own work; and ensure that there are 
suitable welfare facilities.

Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   522   523   524   525   526   527   528   529   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2025
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish