3.9.2 Construction Phase plan
A Construction Phase plan is essentially a collection of 
information about the signifi cant health, safety, environ-
mental and fi re risks of the project. The plan will initially 
be based upon information provided by the client, the 
designer and the coordinator’s own assessment of the 
risks inherent in the project, and will provide the health 
and safety management plan during the construction 
phase.
The initial plan
should include:

A general description of the nature of the project 
and intended completion times

Information regarding the existing structure and 
environment. This will include fi re hazard information 
from the client

Details of the organisation for fi re safety manage-
ment and liaison during the project

Details of signifi cant risks which cannot be avoided 
at the design stage and any fi re risks created by the 
design or specifi cation of the structure

Information regarding the overlap with the client’s 
undertaking including the arrangements for fi re 
emergency and any other site rules laid down by the 
client, e.g. smoking policy

Other safety information, e.g. means of escape in 
case of fi re and fi re fi ghting facilities, signage rating 
to the arrangements for highly fl ammable liquids and 
liquefi ed petroleum gases.
This will amount to a list of hazards for which the princi-
pal contractor must develop suitable control measures.
Health and safety fi le
The CDM coordinator has the legal duty under CDM to 
ensure that the health and safety fi le is compiled for the 
completed building and mechanical and electrical serv-
ices, etc. within. The fi le is then handed to the client on 
completion of the project. The client must then ensure 
that the fi le is kept safe and is available for any inter-
ested party in the future.
The purpose of the health and safety fi le is to 
provide all of the relevant details regarding the structure 
and services, etc. within to anyone who in the future 
may be carrying out further construction work, repairs, 
maintenance or refurbishment of the building or facility.
The precise content of the fi le will depend upon the 
nature and complexity of the structure. However, the 
information contained in the fi le will be provided in part 
by the designer and in part by the principal contractor 
and, in reality, it may well be that the bulk of the work in 
compiling the fi le will be done by the principal contractor 
as they will be in fi rst capture of the information.

Download 8,94 Mb.

Do'stlaringiz bilan baham:
1   ...   88   89   90   91   92   93   94   95   ...   596




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish