15.14.5 Good 
order
Construction sites must be kept in good order, so far as 
is reasonably practicable, and places of work must be 
kept reasonably clean. The perimeter of sites should be 
identifi ed with signs where necessary and the extent of 
the site should be readily identifi able.
Timber or other materials with projecting nails 
must not be either used in any work or allowed to 
remain in any place where they may be a danger to any 
person.


Summary of key legal requirements
365
15.14.6 Stability of structures
All practicable steps must be taken to prevent danger to 
any person from the accidental collapse of any new or 
existing structure which may either become unstable or 
be in a temporary state of weakness or instability due to 
construction work.
15.14.7 Demolition or dismantling
Suitable and suffi cient steps must be taken to ensure 
that demolition or dismantling of a structure or part of 
any structure which gives rise to a risk of danger to any 
person is planned and carried out under the supervision 
of a competent person and in such a manner as to pre-
vent, so far as is practicable, such danger.
15.14.8 Explosives
Explosive charges must only be used or fi red if suit-
able and suffi cient steps have been taken to ensure that 
no person is exposed to a risk of injury from either the 
explosion or by projected/fl ying material caused by the 
explosion.
15.14.9 Excavations
This part of the schedule requires that:
1. All practicable steps are taken to prevent danger to 
persons from accidental collapse of excavations
2. Suitable and suffi cient steps are taken to prevent, so 
far as is reasonably practicable, any person from be-
ing trapped or buried by falling or dislodged materials
3. Suitable and suffi cient equipment is provided to sup-
port excavations and is installed, altered and disman-
tled under the supervision of a competent person
4. Suitable and suffi cient steps are taken to prevent 
any person, vehicle, plant and equipment, earth or 
other materials from falling into any excavation
5. No materials, vehicles, plant and equipment are 
placed or moved near to any excavation where this 
would be likely to cause the excavation to collapse
6. No excavation work is carried out unless suitable 
and suffi cient steps have been taken to prevent any 
risk of injury from underground cables or services.

Download 8,94 Mb.

Do'stlaringiz bilan baham:
1   ...   515   516   517   518   519   520   521   522   ...   596




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish