Figure 8.29
Typical hot work permit
1 Permit title 
3 Job location
2 Permit number
.
Reference to other relevant permits
or isolation certificates
5 Description of work to be done
and its limitations
10 Acceptance – 
signature confirming
understanding of work to be done, hazards
involved and precautions required. Also
confirming permit information has been
explained to all workers involved
12 Hand back – 
signed by acceptor
certifying work completed. Signed by
issuer certifying work completed and
plant ready for testing and
recommissioning
13 Cancellation – 
certifying work
tested and plan satisfactorily
recommissioned
(Signatures – names must be legible)
4 Plant identification
6 Hazard identification – 
including
residual hazards and hazards introduced
by the work
7 Precautions necessary – 
person(s) who
carries out precautions, e.g. isolations, should
sign that precautions have been taken
8
 Protective equipment (PPE)
9 Authorisation – 
signature confirming
that isolations have been made and
precautions taken, except where these can
only be taken during the work. Date and
time duration of permit
11 Extension/shift handover procedures –
signatures confirming checks made that
plan remains safe to be worked upon, and
new acceptor/workers made fully aware of
hazards/precautions. New time expiry given
1
3
4
5
6
7
8
9
10
11
12
13
2


Causes and prevention of fi re
165
identifi es that the movement of hot tar presents a greater 
risk the following should be provided:

An insulated non-combustible base must be pro-
vided for the tar boiler to be placed upon

The boiler should be sited in such a way that spilled 
material can be easily controlled

Hazardous 
material 
(fl ammable substances) must be 
removed from within close proximity

The equipment must be supervised by a competent 
supervisor in particular relating to the bitumen level, 
temperature and lid securing devices

Gas cylinders should be secured in a vertical posi-
tion, fi tted with a regulator and fl ashback arrestor 
and be sited at least 3 metres from the burner

Arrangements to ensure the lit boiler is not left 
unattended

Residual materials should be removed prior to sign-
ing off of the hot work permit.

Download 8,94 Mb.

Do'stlaringiz bilan baham:
1   ...   244   245   246   247   248   249   250   251   ...   596




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish