III. RECOVERY FUNCTION

A. Damage Assessment Function

Damage assessment is the first and one of the most important steps in the recovery process. It is the basis for determining the type and amount of state and/or Federal financial assistance necessary for recovery and mitigation. An initial impact assessment is conducted during the response and immediate recovery phase to support a request for a gubernatorial proclamation and for the state to request a presidential declaration.


Damage assessment has a two-fold mission:

 To identify the immediate needs and resources required to assist disaster victims.

 To substantiate requests for supplemental assistance.
The planning assumption concerning damage assessment includes:


  • The County will conduct an Initial Damage Assessment (IDA) prior to requesting a PDA by the State/FEMA.

  • The County will participate on the FEMA/State PDA to ensure county damages are fully appraised and captured correctly.

Levy County’s capability to conduct its own assessment may be limited due to the extensive damage associated with a catastrophic event.


1. General
Once emergency conditions subside, rapid and thorough assessments must be conducted to assess the overall damage to homes and businesses within the affected areas; to assess the overall damage to critical public facilities and services; and to determine whether those damages are sufficient to warrant supplemental federal disaster assistance.
Recovery response to an emergency will be based upon the assessment of lives impacted, public and private property losses, the reports of actions taken to alleviate the situation and the expenditures committed to that effort. In order to determine the magnitude of the emergency and the degree of assistance necessary, the recovery team at the EOC must have information concerning property damage and operational costs as soon as practicable after the emergency occurrence. Initial assessments may indicate the necessity for outside assistance, including possible requests for Presidential Disaster Declaration.
In a catastrophic disaster when damage assessment has been waived, information and data on damages must still be compiled for briefings, planning for additional recovery resources and prioritizing recovery efforts.
2. Responsibilities
a. Emergency Management

 Coordinates damage assessment training as described in the Basic Plan.

 Collects and consolidates initial damage assessment reports.

 Transmits damage assessment information to the State Warning Point.

 Requests technical assistance if damage assessment is beyond county capabilities.

 Coordinates with state, federal and other damage assessment teams.

 Contacts Damage Assessment Coordinator to report to EOC.

 Develops public/private damage assessment standard operating guidelines and checklists.


b. Building and Zoning Department
The Building and Zoning Director will act as lead in conducting damage assessment of private property and businesses as well as public property and infrastructure.

 Ensures damage assessment teams are properly trained and equipped.

 Contacts Damage Assessment Team members to report to Staging Area for deployment.

 Coordinates damage assessment information received from private property and businesses.

 Assigns damage assessment teams to impact areas.

 Monitors threshold amounts for minor, major and destroyed properties.

 Provides residents with information regarding recovery assistance, informing residents of available services, location of the Disaster Recovery Center, handing out brochures, etc.

 Obtains property assessment information for team members.

 Assists in determining damage assessment values for private property.
c. Clerk of the Court

Conduct training on the damage assessment and public assistance program to include documentation, collection of data, financial management. This will be conducted for all staff who will be involved in the recovery process.


B. Initial Safety and Damage Assessment

In the immediate aftermath of the disaster, Levy County will conduct a countywide Initial Damage Assessment (IDA) consistent with the Damage Assessment Standard Operating Guidelines. The goal of the IDA is to determine the magnitude and severity of damage to structures and infrastructure; and, in the event of a severe rainfall event, determine the level of flooding damage.


All IDA team members must report impact assessment results through their designated chain of command to ESF-5 in the EOC within hours of disaster impact. The results are mapped on a Geographic Information System map with color-coded categories. Levy County has limited GIS capability therefore; the State EOC would be contacted for assistance.
The IDA is conducted by all county agencies that have infrastructure to include Public Works, School Board, Fire Departments, Sheriff’s Office, Property Appraiser, Clerk of the Court, Code Enforcement, Road and Bridge, Maintenance Operations, Building Department, and Health Department. The IDA is coordinated by Levy County Emergency Management, and information is managed by ESF-5 for the County. All of these agencies share the same roles and responsibilities, which is to assess the immediate damages to their facilities, and report them to ESF-5. This is likewise the process for the municipalities, which will conduct their individual IDAs and report their findings to ESF-5. The Emergency Management Director will assign geographic areas, when appropriate, to conduct the IDA in. The damage assessment forms used to perform the PDA are also used to perform the IDAs.
The IDA data provides a countywide general overview of the most significantly impacted areas and, therefore establishes a prioritization mechanism for damage assessment team deployment, resource allocation, and disaster assistance. Once collected by ESF-5, an IDA report is transmitted to the SEOC via EM Constellation.
If outside assistance will be required, the initial damage assessment will be used as the basis for a local declaration of emergency.

Download 2,29 Mb.

Do'stlaringiz bilan baham:
1   ...   14   15   16   17   18   19   20   21   ...   49




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish