И. А. Курбасова Е. И. Силантьева



Download 1,91 Mb.
bet171/247
Sana02.01.2022
Hajmi1,91 Mb.
#307661
TuriУрок
1   ...   167   168   169   170   171   172   173   174   ...   247
Bog'liq
Курбасова

TEXT 7. THE BAM RAILWAY
(1) For hundreds of years the unlimited natural resources of Siberia were out of human reach. The Trans-Siberian Railway, though of immense economic importance, could not meet the growing needs of the developing country's economy.

(2) The project of building the Baikal-Amur Railway was proposed for the first time before the Great October Socialist Revolution. But the tsarist Government could not realize it because of numerous economic and technological difficulties. It is only under the Soviet power that the construction of the BAM Railway has become practicable.

(3) The 3,102 km railway is not the longest line in the world but its construction was an extremely hard job. Long sections of the line were laid in permafrost areas where permafrost is sometimes 100 m thick. Three-quarters of the route were built in the areas subjected to earthquakes.

(4) Consequently, the BAM builders had to solve nu­merous technological and engineering problems: the bridge foundations had to be strengthened, great attention was given to stabilizing the bed of the rivers to be crossed.

(5) In all, the construction of the BAM Railway in­volved the erection of 3,200 engineering structures including over 2,000 bridges and tunnels, with a total length of 32 km.

(6) Now we can use the past tense speaking about the construction of the BAM Railway. On September 29, 1984 the last, so-called golden, rail-length was laid in the track. The significant project was realized within ten years. In addition to 3,102 km of main line 400 km of "Lesser BAM" and some 700 km of station tracks were laid.

(7) Initiating the construction the railway builders had to overcome many difficulties: at first they had to live in tents. They suffered from extreme heat and clouds of mos-quitos in summer while in winter the temperature reached —60 °C and snow was up to one metre deep.

(8) Some 130,000 people of 108 nationalities took part in building the BAM. Hundreds of students' teams includ­ing those from the country's railway transport institutes, spent their so-called "third term" on the BAM construction site. It is to those people that we must express our grati­tude for their great contribution to the further advance of our country.




Download 1,91 Mb.

Do'stlaringiz bilan baham:
1   ...   167   168   169   170   171   172   173   174   ...   247




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish