Installation in Channels
Excavate terminal trenches 12-inch (30 cm)
deep and 6-inch (15 cm) wide across the
channel at the upper and lower end of the lined
channel sections. At 25' intervals along the
channel, anchor the mat across the channel
either in 6- x 6-inch (15 x 15 cm) trenches or by
installing two closely spaced rows of anchors.
Excavate longitudinal trenches 6-inch (15 cm)
deep and wide along channel edges (above
water line) in which to bury the outside mat
edges.
RECPs are anchored in trenches at their ends and edges
and overlapped downslope and in the direction of flow
Place the first mat at the downstream end of the
channel. Place the end of the first mat in the
terminal trench and pin it at one foot (0.3 m)
intervals along the bottom of the trench. The
RECP should be placed upside down in the
trench with the roll on the downstream side of
the trench. Once pinned and backfilled, the mat
is deployed by wrapping it over the top of the
trench and unrolling it upstream. If the channel
is wider than the provided rolls, place ends of
adjacent rolls in the terminal trench, overlapping
the adjacent rolls a minimum of three feet (1 m).
Pin at one foot (0.3 m) intervals, backfill and
compact. Unroll the RECP in the upstream
direction until reaching the first intermittent
trench. Fold the mat back over itself,
positioning the roll on the downstream side of
GEOSYNTHETICS IN EROSION AND SEDIMENT CONTROL: 37
Hard Armor Systems, Rolled Erosion Control Products, Silt Fence
For more information please contact the Geosynthetic Materials Association at www.gmanow.com.
the trench, and allowing the mat to conform to
the trench. Then pin the mat (two layers) to the
bottom of the trench, backfill and compact.
Continue up the channel (wrapping over the top
of the intermittent trench) repeating this step at
other intermittent trenches, until reaching the
upper terminal trench. At the upper terminal
trench, allow the mat to conform to the trench
and secure with pins or staples. Backfill,
compact, and then bring the mat back over the
top of the trench and onto the existing mat with
an overlap of one to three feet (0.6-1.0 m) in the
downstream direction. Finally pin across the
mat at intervals of one foot (0.3 m).
When starting installation of a new roll, begin in
a trench or shingle-lap ends of rolls a minimum
of one foot (0.3 m) with upstream mat on top to
prevent uplifting. Place the outside edges of
the mat(s) in longitudinal trenches, pin, backfill
and compact.