Design First Walters fm qxd 2/26/04 7: 50 pm page I



Download 7,56 Mb.
Pdf ko'rish
bet176/248
Sana07.01.2023
Hajmi7,56 Mb.
#898173
1   ...   172   173   174   175   176   177   178   179   ...   248
Bog'liq
Design First

Figure 10.14
Church Street Section. This section is taken at a ‘typical’ point along the length of the street
rather than at the neighborhood center in order to demonstrate the generic condition. With a street 
width of 130 feet (39 meters), the buildings can rarely be tall enough to create the desired spatial 
enclosure. Disciplined tree planting helps to break down the width and create zones of enclosure 
within the overall space.
Figure 10.13
Haynie Street Section. At this
urban focus, the spatial enclosure on the
neighborhood streets is tightened. Here the
height-to-width ratio is approximately 1:1.5.
The mature trees enhance the enclosure
and sense of a central place.
Walters_10.qxd 3/1/04 5:41 PM Page 209


underground in duct banks and conduits. All new
lateral utility services from the mains into the build-
ings should be underground.
We knew that the negotiations to achieve these
improvements to a main city thoroughfare would be
difficult. The transformation involved a paradigm
shift from thinking about roads as a means of mobil-
ity (getting everywhere as fast as possible) to a
framework of accessibility (providing connections to
a range of users). We asked all parties to remember
a number of key points during the discussions:

Redesigning Church Street in this manner would
be a proactive reparation for the African-American
community consistent with federal environmental
justice policies that protect neighborhoods, partic-
ularly minority neighborhoods, against intrusions
by large traffic projects.

The proposed Church Street changes would be
necessary to promote and retain a mix of land uses,
a walkable urban environment and increased
residential density within close proximity to down-
town Greenville, one of the city’s own Smart
Growth agenda items.

Given the large right-of-way that existed, and the
excess capacity of the six lanes, all our proposed
modifications could be accomplished within
Church Street’s existing kerb lines, offering signifi-
cant cost savings. We estimated the costs for this
project at approximately $3 million, but this public
investment has the potential to leverage $40 mil-
lion in new private development.

Download 7,56 Mb.

Do'stlaringiz bilan baham:
1   ...   172   173   174   175   176   177   178   179   ...   248




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish