DELHI DEVELOPMENT AUTHORITY

ROHINI PROJECT DEVISION NO. 10
Zone – Rohini zone Division – RPD-10

Circle – CC-9/DDA Sub Div – IV/RPD-10

Major head of A/c - Minor head of A/c -

Ref. Of A/A & E/S –


Name of work :- Development of 400 Hact. of land at Rohini phase- IV & V
Sub Head :- Repair of approach road connecting Prahladpur Village.
The detailed estimate for the above said work amounting to Rs. 9,55,170/- (Rs. nine lacs fifty five thousand one hundred seventy only) has been framed by this office for execution of the work including 5% office contingencies.

History

In one of the meeting, held at Raj Niwas on 31.7.07 hon’ble Lt. Governor of Delhi desired that DDA should take up the development of Villages whose land have been acquired. No. of subsequent meetings have been held at Raj Niwas & Vikas Sadan regarding development of villages and directions have been issued for the purpose of repair of approach roads etc. Accordingly, this office has prepared a detailed estimate for strengthening and repair of approach road connecting Prahlad Pur village.

This estimate is based upon the drawing collected personally and PP (R) has not issued any drawing officially.
Specifications :- CPWD specifications 1996 and 2002 volume I to VI with up-to-date

correction slips.


Design & Scope :- At random pot holes filling with WBM has been considered along with

2.5 cm premix carpet surfacing after a tack coat


Method :- By call of tenders
Ref of / DSR :- DSR 2002 with upto date correction slips.
Land :- Available
W/C :- Met out of office contingencies.

Executive Engineer Assistant Engineer-IV

RPD-10 RPD-10

DELHI DEVELOPMENT AUTHORITY

ROHINI PROJECT DEVISION NO. 10
Zone – Rohini zone Division – RPD-10

Circle – CC-9/DDA Sub Div – IV/RPD-10

Major head of A/c - Minor head of A/c -

Ref. Of A/A & E/S –


Name of work :- Development of 400 Hact. of land at Rohini phase- IV & V
Sub Head :- Repair of approach road connecting Sahibabad Daulatpur Village.
The detailed estimate for the above said work amounting to Rs. 9,61,039/- (Rs. nine lacs sixty one thousand thirty nine only) has been framed by this office for execution of the work including 5% office contingencies.

History

In one of the meeting, held at Raj Niwas on 31.7.07 hon’ble Lt. Governor of Delhi desired that DDA should take up the development of Villages whose land have been acquired. No. of subsequent meetings have been held at Raj Niwas & Vikas Sadan regarding development of villages and directions have been issued for the purpose of repair of approach roads etc. Accordingly, this office has prepared a detailed estimate for strengthening and repair of approach road connecting Sahibabad Daulatpur village.

This estimate is based upon the drawing collected personally and PP (R) has not issued any drawing officially.
Specifications :- CPWD specifications 1996 and 2002 volume I to VI with up-to-date

correction slips.


Design & Scope :- At random pot holes filling with WBM has been considered along with

2.5 cm premix carpet surfacing after a tack coat


Method :- By call of tenders
Ref of / DSR :- DSR 2002 with upto date correction slips.
Land :- Available
W/C :- Met out of office contingencies.

Executive Engineer Assistant Engineer-IV

RPD-10 RPD-10

HISTORY- SHEET

Name of work : D/o villages in rohini zone

Sh : c/o Approach road to crimination ground in village Nithari

Major head : Development

Major head : Nazul

The detaikd estimate of the above said work amounting to Rs. 18,32,824/: (Rs eighteen lacs thirty two thousand eight handred twenty four only) rise in cost index e 53% and difference in cost of stipulated material I/c 5% contingencies, has been tramed by executive enginee, R.P.D.10 to cover as the probable cost of above work.
HISTORY During the fortnightly meeting held at ‘Raj Niwas’ on 31.7.07 the Hon’ble L.G of delhi ghas desired to take up the development work of villages, whose land have been acquired by DDA. Accordigly theV. C./DDA vide his letter no Ps/vc/DDA/2007/148-A dt. 1.8.07 has directed to prepare the development plan and take up the work I oe time. The approach road to cremination ground in village ‘nithari’ has not be constructed So for. The died councilor Sh. Rohtas singh has also desired to take up the work on priority thence this estimate has been framed.

Design & scope 100mm thick cemen concrete 1: 5:10 shall be aid after leveling and dressing road with Kota stone stripe 100mm wide & 25mm thick in joints of cement concrete. The adjoining wall towards pond shall be raised with random rubble masonry.

Specification : CPWD specification 1996 xot.1 to IV with up to date correction slips

Rates : Based o DSR-2002 with up to date correction slips.

Time Allowed : Two Mirth

Land : Available.

W.C. Establishment : Shall be met out of 5% contingencies.

Mode : On contract after call of fenders

T&P : Shall be arranged by contractor herself

HESTORY SHEET


Sub:- C/o 526 SFS Houses in pocket-I seelir-18 Rohini .

SH :- P/L II nd phase treatment of. Road appnaeh lo the housing Poeveh with Providing - Caying fool paths and Road gully chamlers with 250 mm R.C.C NP2 Pike thew detal the maintens the alrve housing Pocket is uder supervisam of this dinsun RPD-10 As this housing Pocket was conshueted and complete in 2002 and proconlly almost all the houses leving occupad by the roodenti there is an approach road for this housing pocket from the main road running adjeet to the Boundry g this housing pocket towardsit get .4 Although the the road was coshuelid lay RPD-6Five years boek and it requires immediali reoloralig its prevwas Shape the present condition to in very worsh stuation To get the road I paper shape in requies one layer g WBM lefere premixing be provided on it Gully chamlrrs on loth the sider of road have feen prorded lruh are not in fuetion due to lock of puper shape in conlar in road and also due to lockk of raising of heish of road up to the level so that rtamualir could not be stagnaled on the road during raing seing seasen and be dramind out threogh gully chamlers existing on both the sdes of roads.

While raising the level of this appnarch road ,the berms existing on frith the sides of roads are also required to be raised which can be replaeced into foolpaths prrovrding with indterlocky cement cencril tiles and cemesh cnerel kerbs to guive smooth and clan paedential comemech to the rerdents / school going chjldren in this housing pocket. During the complete of conlichlm work of this housing pocket the attention on provisim for dram out the shagnated water during rang seasen were lift and then at present lock g this provisum is Smell and ummedialely required to void danage to the present cement coerel fworing ties exisiting in the parking are which can be Solved lay providing gully chamlrrs or saueer draims wheehaer be gully chamlrrs or saveer draims wheehever be considered aeadry to feanlrlily g per As quaiily is Small so p nsom paver Sulmtte d for necessary approvol of comptem qullunly.
DELHI DEVELOPMENT AUTHORITY

History Sheet

Name of work :- D/o Villages in Rohini Zone

SH :- Repair of approach road from village Mubarkpur Dabas to Kanjhawla

Road.


Major Head :- Development

Minor Head :- Nazul A/c-II


The detailed estimate amounting to Rs. 34,48,574/- i/c. 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. The area was inspected alongwith the area councilor Sh. Rohtas Singh who has desired that the approach road from village Mubnarak Pur Dabas to Kajhawala road needs immediate repair. A detailed survey has been conducted at site and found that the road near pond and approach road is broken at many places and local depression exists resulting inconvenience to traffic and stagnation of water. This stagnation of water is further damaging the road due to movement of vehicles and need immediate repair. Since this a approach road connected to Rohini and is being utilized by lot of people daily and require repairs, hence this estimate has been framed.
Design & scope :- All damaged portion of road shall be repaired with a layer of WBM with stone aggregate 53 to 22.4mm. All local depression and broken road edges shall be repaired with W.B.M. Thereafter all repair work shall be covered with 2.5cm premix carpeting. Since klidening of road is not possible due to level difference hence all Kuchha berms shall be provided with interlocking paver block 80mm thick. Edging of road shall be provided with C.C. Kerb stone.
Specification :- CPWD specification 1996 Vol I to VI and revised CPWD specification 2002 for cement mortar, cement concrete and RCC with upto date correction slips.
Rates :- Based on DSR-02 with upto date correction slips and SE(P) rates

Mode :- On contract after call of tenders

Time allowed :- Four months.

Land :- Available

T&P :- Shall be arranged by contractor himself

W.C. staff :- Shall be met out of 5% contingencies

Estimated Cost :- Rs. 32,84,356/-

Executive Engineer

/DDA

DELHI DEVELOPMENT AUTHORITY

History Sheet

Name of work :- D/o Villages in Rohini Zone

SH :- Repair of approach road from Sector-22 Rohini to Village Nithari

Major Head :- Development

Minor Head :- Nazul A/c-II
The detailed estimate amounting to Rs. 30,61,473/- i/c 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. The area was inspected alongwith the area councilor Sh. Rohtas Singh who has desired that the approach road from sector-22, Rohini to village Nithari needs immediate repair. A detailed survey has been conducted at site and found that the road near pond and approach road is broken at many places and local depression exists resulting inconvenience to traffic and stagnation of water. This stagnation of water is further damaging the road due to movement of vehicles and need immediate repair. Since this a approach road connected to Rohini and is being utilized by lot of people daily and require repairs, hence this estimate has been framed.
Design & scope :- All damaged portion of road shall be repaired with a layer of WBM with stone aggregate 53 to 22.4mm and local depression shall be repaired with W.B.M. 2.5 cm premix shall be done on repaired portion of road. Road berms shall be provided with interlocking tiles 80mm thick. Kerb stone shall be provided on berms to protect interlocking tiles.

Specification :- CPWD specification 1996 Vol I to VI and revised CPWD specification 2002 with upto date correction slips.


Rates :- Based on DSR-02 with upto date correction slips

Mode :- On contract after call of tenders

Time allowed :- Four months.

Land :- Available

T&P :- Shall be arranged by contractor himself

W.C. staff :- Shall be met out of 5% contingencies

Estimated Cost :- Rs. 29,15,689/-

Executive Engineer (P)

CC-9/DDA

DELHI DEVELOPMENT AUTHORITY

History Sheet

Name of work :- D/o Villages in Rohini Zone

SH :- Repair of approach road from village Nithari to village Kirari.

Major Head :- Development

Minor Head :- Nazul A/c-II
The detailed estimate amounting to Rs. 2831215/- i/c 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. The area was inspected alongwith the area councilor Sh. Rohtas Singh who has desired that the approach road from village Nithari to village Kirari needs immediate repair. A detailed survey has been conducted at site and found that the road near pond and approach road is broken at many places and local depression exists resulting inconvenience to traffic and stagnation of water. This stagnation of water is further damaging the road due to movement of vehicles and need immediate repair. Since this a approach road connected to Rohini and is being utilized by lot of people daily and require repairs, hence this estimate has been framed.
Design & scope :- All damaged portion of road shall be repaired with a layer of WBM with stone aggregate 53 to 22.4mm and local depression shall be filled up with a layer of W.B.M. 2.5 cm premix shall be done on repaired portion. Kucha berms shall be provided with interlocking paver blocks. Kerb stone shall be provided wherever needed.

Specification :- CPWD specification 1996 Vol I to VI and revised CPWD specification 2002 with upto date correction slips.


Rates :- Based on DSR-02 with upto date CS and market rates issued by SE(P)

Mode :- On contract after call of tenders

Time allowed :- Four months.

Land :- Available

T&P :- Shall be arranged by contractor himself

W.C. staff :- Shall be met out of 5% contingencies

Executive Engineer

/DDA


DELHI DEVELOPMENT AUTHORITY
Name of work :- D/o Villages in Rohini Zone

SH :- C/o one number dust bin in Village

Major Head :- Development

Minor Head :- Nazul A/c-II


The detailed estimate amounting to Rs. 290901.00 i/c 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. As per directions the area has been inspected along with area councilor Sh. Rohtas Singh. It has been observed that the public/residents of the area are throwing their waste here & there resulting unhygienic condition the area mosquitoes and flies are breading on them. Since there is no Dhaloa/dust bin has been constructed in the area so far, hence the area councilor has desired to construct a dust bin in the area immediately to avoid spreading the disease. Hence, this estimate has been framed to provide facility to the residents of area, enabling them to throw their waste/garbage etc at one point.
Design & scope :- The estimate has been prepared on the basis of drawing & design approved by M.C.D. and followed by DDA in their earlier estimate.

Specification :- CPWD specification 1996 Vol I to VI and revised CPWD specification 2002 for cement mortar, cement concrete and RCC both with upto date correction slips.


Rates :- Based on DSR-02 with upto date CS.

Time allowed :- Two months.

Land :- Available

Mode :- On contract after call of tender

T&P :- Shall be arranged by contractor himself

Estimated Amt. :- Rs. 277049.00

W.C. Establishment : Shall be met out of 5% contingencies

AE-II/RPD-10 Executive Engineer

RPD-10/DDA

DELHI DEVELOPMENT AUTHORITY
Name of work :- D/o Villages in Rohini Zone

SH :- C/o Boundary wall around vacant plots at Village Mubarak Pur Dabas

Major Head :- 15-Deposit

Minor Head :-


The detailed estimate amounting to Rs. 6,76,699.00 i/c 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. As per directions the area has been inspected along with area councilor Sh. Rohtas Singh. The area councilor has desires that all vacant land of ‘Gram Sabha’ needs protection to avoid encroachment so the same shall be utilized for public interest in future. Accordingly it is found that the vacant land near temple and at an another location needs immediate protection. Hence this estimate has been framed.
Design & scope :- Stone masonry wall in C.M. 1:6 shall be constructed upto a height of 1.50 meter above G.L. around vacant plots. SFRC railing of 1.00mX1.00m shall be provided at top of wall, C.C. 1:2:4 coping shall be laid at the top.

Specification :- CPWD specification 1996 Vol I to VI with upto date C.S. and revised CPWD specification 2002 for C.M., C.C. & RCC with upto date C.S.

Rates :- Based on DSR-02 with upto date C.S. and market rates

Time allowed :- Two months.

Land :- Available

T&P :- Shall be arranged by contractor himself

Estimated Amt. :- Rs. 616856.00

W.C. Establishment : Shall be met out of 5% contingencies

A&ES : Yet to be accorded by competent authority. However permission for

call of tenders has been granted.


AE-II/RPD-10 Executive Engineer

RPD-10/DDA

DELHI DEVELOPMENT AUTHORITY
Name of work :- D/o Villages in Rohini Zone

SH :- C/o Boundary wall near pond at Village Kirari Suleman

Major Head :- 15-Deposit

Minor Head :-


The detailed estimate amounting to Rs. 5,64,376.00 i/c 5% contingencies has been framed by Executive Engineer, RPD-10/DDA to cover up the probable cost of above said work.
History :- During the fortnightly meeting held at “Raj Niwas” on 31.7.07 the Hon’ble LG of Delhi has desired to take up the development works of Villages whose land have been acquired by D.D.A. Accordingly, VC/DDA vide his letter No. PS/VC/DDA/2007/148-A dt. 1.8.2007 has directed to prepare the development plans and take up the works at once. As per directions the area has been inspected and found that the pond situated at the entrance of village needs to be protected by constructing boundary wall. The residents of the area are dumping their waste/garbage etc here & there near pond. Moreover this pond is very much prone to cause accident and mishappening. Since all waste water is collected in this pond hence to avoid any mishappening the estimate for constructed boundary wall around it has been framed.
Design & scope :- Stone masonry wall in C.M. 1:6 shall be constructed near pond. The height of wall shall be 1.50 meter above G.L. SFRC railing of size 1.00mX1.00m shall be provided at top of wall. C.C. coping 1:2:4 shall be laid at the top of B. wall.

Specification :- CPWD specification 1996 Vol I to VI with upto date C.S. and revised CPWD specification 2002 for C.M., C.C. & RCC with upto date C.S.

Mode :- On contract after call of tenders.

Rates :- Based on DSR-02 with upto date C.S. and market rates

Time allowed :- Two months.

Land :- Available

T&P :- Shall be arranged by contractor himself

Estimated Amt. :- Rs. 5,37,501.00

W.C. Establishment : Shall be met out of 5% contingencies

A&ES : Yet to be accorded. However permission for call of tenders has been



granted by Competent Authority.
AE-II/RPD-10 Executive Engineer

RPD-10/DDA
Download 53 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish