Centre for Alternative Wastewater Treatment


FINANCIAL CONTEXT OF REGION



Download 4,87 Mb.
bet4/18
Sana04.06.2017
Hajmi4,87 Mb.
#10404
1   2   3   4   5   6   7   8   9   ...   18

3.3 FINANCIAL CONTEXT OF REGION

3.3.1 General financial context



Fig. 2. Breakdown of expenditures and revenues for the Government of Nunavut for 2008-2009 (GN, 2007b).

, 2005)




FIG. 3. Capital expenditures in the 2008-2009 budget for the Government of Nunavut (GN, 2007a, p. viii)


(thousands)

FIG. 4. Overall financial position (including funds and reserves) for Nunavut municipalities in 2005/2006 (MTO, 2006, p.7)




(thousands)

FIG. 5. Overall financial position less reserves for Nunavut municipalities in 2005/2006 (MTO, 2006, p.7)


3.3.2 Source of infrastructure and wastewater operation funds


Of the 25 communities in Nunavut, Iqaluit is tax-based and all others are non-tax-based. A large part of the revenue for non-tax based communities is derived from the GN, delivered through a municipal funding program. Iqaluit receives funding through an equalization grant. Recently, the GN formed a partnership with the Nunavut Association of Municipalities to plan and implement municipal infrastructure projects, using territorial and federal funding (Treff and Perry, 2005).


TABLE 2: Expenditures over the next 5 years related to wastewater infrastructure from the Government of Nunavut 2008-2009 Capital Estimates budget (Adapted from GN 2007a)

Detail of Capital

2007/

2008 Revised Budget

($000)

2008/

2009 Planned ($000)

2009/ 2010 Planned ($000)

2010/ 2011 Planned ($000)

5 -Year Capital Plan, CGS













Resolute Bay Sewage and Water Works

500

102

-

-

Rankin Inlet Sewage Treatment Plant

3,627

1,050

4,450

150

Kugaaruk Sewage Lagoon

984

500

70

-

Kugluktuk Sewage Lagoon and Solid Waste

1,746

2,500

32

-

5-Year Gas Tax Projects, NCIAC/CGS Capital Projects













Arctic Bay sewage lagoon

-

250

2,250

-

Clyde River new sewage lagoon

1,500

750

-

-

Igloolik sewage/solid waste

-

50

450

-

Kimmirut reclamation of abandoned lagoon and solid waste sites

-

100

900

-

Chesterfield Inlet sewage lagoon

-

150

850

-

Cambridge Bay sewage lagoon

250

1,500

750

-

5-Year Strategic Infrastructure Fund Projects, NCIAC/CGS Capital Projects













Arctic Bay sewage lagoon

-

250

2,250

-

Clyde River new sewage lagoon

1,500

750

-

-

Igloolik sewage/solid waste

-

50

450

-

Kimmirut reclamation of abandoned lagoon and solid waste sites

-

100

900

-

Chesterfield Inlet sewage lagoon

-

150

850

-

Cambridge Bay sewage lagoon

250

1,500

750

-
In the 2008-2009 budget, Community and Government Services was allocated 23.5% of GN capital dollars, the second largest share of any GN department after education (26.0%) (GN, 2007a).

Download 4,87 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   18




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish