Azerbaijan republic ministry of transport road transport service department


Prior to construction works, the following method statements/plans shall be submitted by the Contractor to the ESS for approval



Download 0,72 Mb.
bet15/16
Sana02.02.2017
Hajmi0,72 Mb.
#1651
1   ...   8   9   10   11   12   13   14   15   16


Prior to construction works, the following method statements/plans shall be submitted by the Contractor to the ESS for approval:

  1. A plan indicating the location of the proposed extraction site as well as rehabilitation measures to be implemented for the borrow areas and access roads upon project completion

  2. Dust management plan which shall include schedule for spraying on access road and details of the equipment to be used

  3. Layout of the work camp and details of the proposed measures to address adverse environmental impacts resulting from its installation. The plan shall be consistent with the provisions of the construction norms BCH 8-89

  4. Sewage management plan for provision of sanitary latrines and proper sewage collection and disposal system to prevent pollution of watercourses

  5. Waste management plan covering provision of garbage bins, regular collection and disposal in a hygienic manner, as well as proposed disposal sites for various types of wastes (e.g., domestic waste, used tires, etc.) consistent with appropriate regulations

  6. Description and layout of equipment maintenance areas and lubricant and fuel storage facilities including distance from water sources and irrigation facilities. Storage facilities for fuels and chemicals will be located away from watercourses. Such facilities will be bounded and provided with impermeable lining to contain spillage and prevent soil and water contamination

  7. Soil Management Plan detailing measures to be undertaken to minimize effects of wind and water erosion on stockpiles of topsoil and excess materials, measures to minimize loss of fertility of top soil, timeframes, haul routes and disposal sites for excess materials.

  8. plan for the execution of bridge construction works including measures that will be undertaken to address adverse environmental impacts such as erosion of river embankment and siltation of watercourses that may result from such activities.

  9. Emergency response plan (in case of spills, accidents, fires and the like) prior to operation of the asphalt plant

  10. A plan (mechanism and organizational structure) detailing the means by which local people can raise grievances arising from the construction process and how these will be addressed (e.g., through dialogues, consultations, etc.).



Annex B. ENVIRONMENTAL MONITORING PLAN

Aspect

Parameters to be monitored

Location

Methodology

Timing

Institutional Responsibility for Monitoring

Permits/Clearances

Existence of permits from MENR for borrow areas, asphalt plants, disposal sites and tree cutting as well as clearance from the MOH for establishment and operation of work camps.




Inspection

Before commencement of site works or installation of facilities

ESS/CSC

Contractor’s yard

Solid waste handling and disposal facilities

Drainage conditions

Sanitation facilities and sewage disposal

Heath facilities



Contractor’s yard

Inspections, observations

Unannounced inspections during construction

ESS/CSC

Equipment maintenance and fuel storage areas

Storage and handling practices

Condition of storage facilities of fuel, lubricants and paints

Spillage

Drainage conditions




Contractor’s yard

Inspections, observations

Unannounced inspections during construction

ESS/CSC

Borrow areas and access roads

Watercourses in the vicinity (obstruction, siltation, etc.)

Dust emission along access roads, particularly near settlements.



At site and access roads

Inspections, observations, consultation with nearby communities

Unannounced inspections during construction and after complaint


ESS/CSC

Asphalt plant


Exhaust fumes

At site

Inspections, observations, consultation with nearby communities

Unannounced inspections during construction and after complaint

ESS/CSC

Worker’s Safety

Provision and use of appropriate personnel safety equipment

Job site

Inspections; observations and interviews

Unannounced inspections during construction

ESS/CSC




Annex B. ENVIRONMENTAL MONITORING PLAN

Aspect

Parameters to be monitored

Location

Methodology

Timing

Institutional Responsibility for Monitoring

Top soil preservation and final disposal site of excess materials

Stockpiling and means of protection


Job site

Inspections, observations

Upon preparation of the construction site, after stockpiling and after completion of works on embankment slopes

ESS/CSC

Traffic safety



Existence of traffic management plan approved by the local traffic authority




Inspection,


Before commencement of site works

ESS/CSC

Implementation of various provisions in the traffic management plan.

Job site

Inspection, observations and consultations with nearby communities

During construction period (twice a week, i.e., once during daytime and another during nighttime)


ESS/CSC

Worker’s education on HIV/AIDS and STD

Implementation of the awareness campaign and worker’s knowledge

Worker’s camp

Interviews

After beginning of works and at appropriate intervals throughout construction

ESS/CSC

Transport of materials

Dust emission

Throughout project road, access roads and construction

Inspections, consultation with communities

Unannounced inspections during construction

ESS/CSC

Bridge Construction

Compliance with recommended bridge construction schedule for two bridges over Ceyrenckecmez river




Meeting with contractor, inspections and observation

Prior to commencement of site works and during Lesser Kestrel breeding season from April to August.

ESS/CSC

Surface water protection


Bridge construction sites

Inspections, observations

unannounced inspections during bridge works

ESS/CSC

Various construction activities

Exhaust fumes and noise due to operation of heavy equipment

At site


Inspection, observations and consultations with nearby communities

unannounced inspections during works


ESS/CSC

Provision of vegetation

Progress/status of provision of vegetation cover in erosion/landslide prone areas and roadsides along settlements, particularly in the vicinity of Maraza and Shamakhi

Along project road

Inspections, observations

Monthly during construction
Quarterly during operation

ESS/CSC

Annex C. Results of Public Consultation and List of Participants – Qobustan District (Maraza, 8 December 2005)

Comment

Response

Representative of Narimankend municipality:

Part of the project road runs through our village and there are some structures along the road. Some people have legal documents for such properties while others do not. What will be the procedure on compensation?



According to the World Bank requirements, people should get compensation even if they do not legally own the land while according to Azeri legislation, illegal users have to move without compensation. This, however, is not a project issue since the rehabilitation will be undertaken without requiring land acquisition or removal of permanent structures. The road will be rehabilitated within the existing ROW, widening will not be undertaken.

Chief of Civil Defence Headquarters

This road is considered to be a tourism route and based on international standards, such road should be provided with roadside rest areas with sanitation facilities every 25 km. Will these be implemented under this project?


The area at km 110 km in Maraza is used as a pastureland where about 5 to 10 animals are hit by passing vehicles on a daily basis. Is it possible to install fences in this area?
Due to the relief, mountain slopes (serpentines, small hills) limit visibility of the road and should be cut. Further, some sections along km 60 to km 80 and km 105 to km 110 are active landslide zones.

These recommendations will be considered in the design and will be subject to further consultations.

Improvement of road safety is one of the aims of the proposed rehabilitation, these aspects will be considered in the design.


Representative of Bedelli village

The bus stop area at 100 km is known as a dangerous zone with high percentage of road accidents, some of which are fatal, as there are several access roads crossing at this place. We propose that a two-lane road (at each direction) about 300 m long be provided in this section.

This road mainly runs through highlands and usually there is thick fog in this area. In order to improve traffic safety, is it possible install guardrails and other provisions to improve visibility?

Since the road is classified as Category II, the rehabilitation shall not involve widening. However, improvements to the junction, e.g., provision of some turning lanes, will be considered to improve road safety.



This will be considered in the design.




No.

Name


Position/Address

Contact number

1

Alikram Cumeli Javadov

Chief of Road Maintenance Unit No.8, Maraza Settlement

5-00-25

2

Shikhbala Nesreddin Bayramov

Chief of Civil Defense Headquarters

5-27-54

3

Fizuli Qarib Gulaliyev

Deputy Mayor of Executive Power

5-25-18

4

Agakhan Ali Ibadov

Representative of Badalli village

5-01-16

5

Nezerkhan Gulkhan Nabiyev

Representative of Shikhali village

5-22-13

6

Elkhan Babasen Qayibov

Representative of Narimankend

5-00-26

7

Avtandil Heybat Shikarov

Representative of Maraza

5-23-18

8

Hayan Shirzad Sadayev

Chairman of Badalli Municipality




9

Arif Gulaliyev Amrullah

Chairman of Shikhali village




10

Teyfur Zeynal Amrahov

Chairman of Teklekend village




11

Ruzgar Najaf Shikarov

Assistant of Teklekend representative

6-11-21

12

Vugar Novruz Mardanov

Chairman of Narimankend village

5-21-21

13

Said Agakishi Jafarli

Deputy of mayor on social issues

5-00-03

Annex D. Results of Public Consultation and List of Participants – Shamakhi District

Comment

Response

Chief of Road Maintenance Office #9

According to the information you provided, the rehabilitation will be undertaken on the existing road with minor changes. Traffic counts in Shamakhi reaches 8-12 thousand vehicles per day during weekends. With this traffic volume, how can road safety be ensured without widening?


Shamakhi observatory is considered a tourist place and traffic increases day by day

The municipality has allocated its land to the population and some of them are even within the ROW. How will these people be treated?

In Shamakhi some part of the road runs near the graveyard and some houses are too close to the road.
At km 110 km near Ajidere, at the entrance to Muganli, there is an increasing sliding zone, which is dangerous especially in winter.

Will the wearing course be kept during rehabilitation?


Based on the results of the traffic counts we conducted, there has been some recent increase in traffic volume with the highest rate recorded at km 15. Traffic counts reached 8-10 thousand vehicles per day at the first 22 km of the project road. Widening will be made in this section but this is still under discussions.


This is a second category road and cannot be widened, but provision of a 2 m paved shoulder on each side of the road is being considered.
According to our legislation, it is forbidden to have any activity or structure within the ROW and there are legal procedures to expropriate the land. But the scope of our project is rehabilitation and will not require land acquisition.
Our task is to stay within existing alignment without widening and improve the traffic safety in dangerous places.
The regional road maintenance department conduct regular maintenance of roads. Within our project, geotechnical engineers are engaged in the project and results of the tests they have done in 5 to 6 places will be considered in the design.
It is supposed that at least wearing course will be removed, as well other unfit materials. More information will be available during the next stages after the road layers are analyzed.

Representative of the Executive Power in Merzende village

At 113 km the project road crosses with the access road leading to our village and we have high percent of road accidents here especially on weekends when traffic volume is high.



The design will consider improvement of the junction and we shall present detailed drawings during the next consultation with regard to technical specifications of the project.





No

Name


Position/Address

Contact number

1

Rovshan Khalmali Safarov

Representative of Meysarli village

349-02-96

2

Jabrail Qarib Yahyayev

Engineer of Shamakhi Municipality

720-18-45

3

Musa Mahammad Musayev

Chairman of Shahriyar Municipality

9-47-05

358-13-05



4

Babek Seyfulla Qasimov

Chairman of Secon Jabani village

337-25-36

5

Seyidrza Muradkhan Nabiyev

Representative of Secon Jabani village

392-32-98

6

Rahim Khalilulla Khalilov

Chairman of Hamyali Municipality

9-14-31

7

Sardar Qara Omarov

Representative of Hemyeli village

351-38-44

8

Samad Bedgabdan Mejnunov

Merzendiye Municipality of Shamakhi

372-23-17

9

Tahir Agaismayil Hashimov

Representative of Merzendiyye

785-33-59

10

Sahib Uruf Nabiyev

Qurdtepe Municipality of Shamakhi

392-78-34

11

Nariman Qazam Narimanov

Representative of Qurdtepe village

3559480

12

Feygar Eldar Deydajov

Representative of Mugana village

3489980

13

Natiq Pasha Azizov

Chairman of Muganli Municipality

3453319

14

Mohubbat Jallad Mammadov

Representative of Mirzekend

5794530

15

Zohrab Gulkhas Shahbazov

Chairman of Garavelli Municipality

391-84-60

16

Kamil Haji Samandarov

Chairman of Mirzekend

670 03 23

17

Sefa Yunus Samadov

Chief Engineer of Executive Power

3745151

18

Adalet Mehrali Omarov

Chief of Road Maintenance Unit No. 9

2022550

19

Aladdin Avaz Musayev

Chief Architecture-Construction Department

3534123

20

Agagedir Reshid Osmanov

Representative of Shehriyar settlement

3791517

21

Shahnezer Seybaba Qasimov

Representative of Shamakhi

6486665

22

Mehman Adalet Efendiyev

Chief of Department of Executive Power

6676410

Download 0,72 Mb.

Do'stlaringiz bilan baham:
1   ...   8   9   10   11   12   13   14   15   16




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish