Representative of Hokmali settlement
Will there be compensation for affected structures?
|
The project will involve rehabilitation within the ROW such that land acquisition, resettlement and removal of permanent structures are not expected.
|
Chief of District Department No.4 of Ministry of Ecology and Natural Resources
Not all borrow pits are defined under this project, all borrow pits are to be defined in the reports. We know that all foreign companies will follow all environmental requirements, but unfortunately local companies will not.
The trees planted along the road near Cengi are young, but in Shamakhi the trees along the road are mature and their cutting will have adverse impact on the environment.
|
As required by the MENR, the contractors shall secure an environmental clearance prior to operation of the borrow areas. Detailed layout of the proposed borrow area and method statement shall also be submitted by the contractor for the approval of MENR as well as of ESS and CSC. The contractor shall also be required to employ a full time environment, health and safety manager who will supervise and ensure implementation of required mitigation measures. During operation, the environmental performance of the contractors shall be monitored by the ESS with the assistance of an international environmental specialist of the construction supervision consultant. This is to ensure that the provisions of the EMP are properly implemented by the contractor.
In Cengi, as the trees are still young, these will be transplanted prior to construction works. Not all trees along the road in Shamakhi will be cut. Only those that are too close to the road will be removed for traffic safety reasons. Cut trees will be replaced through compensatory planting.
|
Water-canalization Department
How will the relocation of utilities be undertaken and who will be responsible for this?
What will be the thickness of asphalt pavement?
|
There will be proper coordination with the concerned agencies/authorities (e.g., for gas facility, electricity, etc.) to ensure that utilities are relocated prior to construction.
Asphalt surfacing will be 50 mm thick while binder and base will have a total thickness of about 200 mm.
|
Chief of Department of Architecture and Construction
How long will be the construction period?
Will the new road be a two-or one lane road?
|
Construction will be undertaken for 3 years starting mid 2006 until mid 2009.
It will be a two-lane road (i.e., one lane per direction).
|
Chief of Gas Department of Absheron Region
There are gas pipelines along the road at km km 16-18 near Mushfiq settlement. Is this considered under the project?
|
Consultation/coordination with the Gas Department will be made to arrive at an agreement on the design approach with regard to the pipelines.
|
No.
|
Name
|
Occupation/Agency/Address
|
Contact number
|
1
|
Elimkhan Abdul Mehraliyev
|
Editor of Absheron newspaper
|
442-44-58
|
2
|
Qazanfar Muzaffar Aliyev
|
Chief of District Department No.4 of Ministry of Ecology and Natural Resources
|
660 24 44
4181824
|
3
|
Fikret Murad Babayev
|
Representative of Ashagi Guzdak village
|
443-96-00
443-96-55
313-55-96
|
4
|
Yaver Sular Huseynov
|
Representative of Hokmali settlement
|
442-11-60
442-31-21
|
5
|
Elmar Zulfugar Humbataliyev
|
Chief of Absheron Telecommunication
|
442-33-00
213-66-01
|
6
|
Vidadi Jumshud Abbasov
|
Chief of Khirdalan Electricity Network
|
442-11-42
225-29-61
|
7
|
Hamid Huseynov Vali
|
Chairman of Pirekeshkul-Qobustan Municipality
|
542-58-22
443-99-24
|
8
|
Etibar Aga Musayev
|
Chief of Nature’s Present Organization
|
213-03-30
410-57-07
410-58-08
|
9
|
Yashar Qiyas Osmanov
|
Chief of Gas Department of Absheron Region
|
206-07-22
442-11-27
|
10
|
Akif Alas Aliyev
|
Chief of Department of Architecture and Construction
|
212-22-31
442-11-14
|
11
|
Boyukaga Safar Abbasov
|
Chief of Ashagi Guzdak Municipality of Absheron region
|
3642589
443-97-01
|
12
|
Jahan Karam Ismayilov
|
Representative of Pirekeshkul-Qobustan villages of Absheron
|
3650443
443-98-01
|
13
|
Fariz Murad Aliyev
|
Consultant of Department of Social-Economical Issues
|
332-47-77
442-11-16
|
14
|
Mirzabala Rerhimbala Asanov
|
Chief of Department of Social-Economical Issues
|
442-05-92
318-39-92
|
15
|
Mirnemat Miraziz Mirhadiyev
|
Chairman of Hokmali Municipality
|
442-28-64
|
16
|
Qorkhmaz Abbas Abbasov
|
Water-canalization Department
|
442-31-11
221-86-74
|