2 cissp ® Official Study Guide Eighth Edition



Download 19,3 Mb.
Pdf ko'rish
bet779/881
Sana08.04.2023
Hajmi19,3 Mb.
#925879
1   ...   775   776   777   778   779   780   781   782   ...   881
Bog'liq
(CISSP) Mike Chapple, James Michael Stewart, Darril Gibson - CISSP Official Study Guide-Sybex (2018)

 Read-Through Test 
The
read-through test
is one of the simplest tests to conduct, but it’s also one of the most 
critical. In this test, you distribute copies of disaster recovery plans to the members of the 
disaster recovery team for review. This lets you accomplish three goals simultaneously: 

It ensures that key personnel are aware of their responsibilities and have that knowledge 
refreshed periodically. 

It provides individuals with an opportunity to review the plans for obsolete information 
and update any items that require modification because of changes within the 
organization. 

In large organizations, it helps identify situations in which key personnel have left the 
company and nobody bothered to reassign their disaster recovery responsibilities. This 
is also a good reason why disaster recovery responsibilities should be included in job 
descriptions.


Testing and Maintenance 
837
Structured Walk-Through

structured walk-through
takes testing one step further. In this type of test, often referred 
to as a 
table-top exercise
, members of the disaster recovery team gather in a large confer-
ence room and role-play a disaster scenario. Usually, the exact scenario is known only to the 
test moderator, who presents the details to the team at the meeting. The team members then 
refer to their copies of the disaster recovery plan and discuss the appropriate responses to 
that particular type of disaster.
Simulation Test
Simulation tests
are similar to the structured walk-throughs. In simulation tests, disaster 
recovery team members are presented with a scenario and asked to develop an appropriate 
response. Unlike with the tests previously discussed, some of these response measures
are then tested. This may involve the interruption of noncritical business activities and the 
use of some operational personnel.
Parallel Test
Parallel tests
represent the next level in testing and involve relocating personnel to the 
alternate recovery site and implementing site activation procedures. The employees relo-
cated to the site perform their disaster recovery responsibilities just as they would for an 
actual disaster. The only difference is that operations at the main facility are not inter-
rupted. That site retains full responsibility for conducting the day-to-day business of the 
organization.

Download 19,3 Mb.

Do'stlaringiz bilan baham:
1   ...   775   776   777   778   779   780   781   782   ...   881




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish