Do periodical inspection to internal space & external surface of boiler according to the 
stipulation of 

Safety & Technical Supervision Regulation for Steam Boiler

. In generally, do 
internal inspection every two years, do hydraulic testing to boiler for one time every six years. 

Except for above item 1 mentioned periodical inspection, if happen to one of following case, 
must do internal & external inspection and hydraulic testing: 
2.1 New installing, re-installing and move installing boiler. 
2.2 Stop running boiler for over one year, before re-start running boiler. 
2.3 After repair or change some pressure parts greatly and re-running boiler for one year. 
2.4 According to the boiler running status, has doubt to the equipments status. 

Before inspection, should remove all the internal scale and external smoke dirt thoroughly, 
if necessary, should disassemble the external cover and insulation layer. The inspection focal 
point is as following: 
3.1 Check the boiler drum, furnace weld and tube-hole to see whether they are in normal status, 
whether exist leakage. 
3.2 Whether the boiler steel plates have corrosion, bulb or deformation. 
3.3 Whether there is scale or water slag beside pressure parts. 


WNS Series horizontal Oil-fired (Gas) Boiler
-13- 
3.4 Whether there is fault at the connecting position between feeding water pipe, draining 
water pipe and boiler drum. 

If find serious corrosion, should check the strength calculation before hydraulic testing. 

Testing pressure 
The testing pressure should comply with the requirements of table 10-1 of 

Safety & 
Technical Supervision Regulation for Steam Boiler



Hydraulic testing sequence 
6.1 The hydraulic testing should be conducted under the condition of the surrounding 
temperature upper than 5

, if the temperature is lower than 5

, should take some 
anti-freezing measures. The temperature of testing water should be higher than surrounding 
dew point temperature so as to prevent dew on the boiler surface; but too high temperature also 
is not suitable, because if may cause vaporization or too large stress of temperature difference, 
in generally, it should be 20
℃~
70


6.2 After the boiler is filled with water, raise the pressure step by step to 0.4Mpa, do tightness 
inspection one time, if necessary, can tighten the stud of flange, manhole cover and hand-hole 
cover for one time. 
6.3 Hydraulic testing should be continued slowly, when water pressure is up to working 
pressure, should stop raising pressure, check it to see whether there are eater leakage or 
abnormal phenomena, and then raise the pressure to testing pressure. Keep it for 20minutes, if 
the pressure didn

t drop, should make inspection after dropping to working pressure. During 
inspection the pressure should kept no change. 
If find any leakage should well make record for later repairing when the pressure drop to 
atmosphere. 

After hydraulic testing, if find the components meet the following requirements, it should be 
considered as good. 
7.1 No any water drop and water fog on the metal wall and weld. 
7.2 No any residual deformation can be observed by eyes. 

Safety measures and attention items 
8.1 It is not permitted to tighten flange stud when the pressure is over than 0.4 Mpa. 
8.2 In order to avoid happening dangers because of crowd, should provide special mark while 
conducting hydraulic test. 
8.3 No stand the opposite of weld hole, flange and valves while exist pressure. 

Download 119,33 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish