Figure 6-22. Control Schedule: Inputs, Tools & Techniques, and Outputs

Tools & Techniques

Inputs

Outputs

Control Schedule

.1  Data analysis

• 

Earned value analysis



• 

Iteration burndown chart

• 

Performance reviews



• 

Trend analysis

• 

Variance analysis



• 

What-if scenario analysis

.2  Critical path method

.3  Project management  

  information system

.4  Resource optimization

.6  Leads and lags

.7  Schedule compression

.1  Project management plan

• 

Schedule management plan



• 

Schedule baseline

• 

Scope baseline



• 

Performance measurement

  baseline

.2  Project documents

• 

Lessons learned register



• 

Project calendars

• 

Project schedule



• 

Resource calendars

• 

Schedule data



.3  Work performance data

.4  Organizational process assets

.1  Work performance  

 information

.2  Schedule forecasts

.3  Change requests

.4  Project management plan  

 updates


• 

Schedule management plan

• 

Schedule baseline



• 

Cost baseline

• 

Performance measurement



  baseline

.5  Project documents updates

• 

Assumption log



• 

Basis of estimates

• 

Lessons learned register



• 

Project schedule

• 

Resource calendars



• 

Risk register

• 

Schedule data




��

223


• Project

   charter

4.3

Direct and



Manage

Project Work

• 

W

ork performance data



Project management plan

•  Schedule management plan 

•  Schedule baseline

•  Scope baseline 

•  Performance measurement baseline

Project documents

•  Lessons learned register

•  Project calendars

•  Project schedule

•  Resource calendars

•  Schedule data

Project


Management

Plan


Project

Documents

Project

Documents

4.6

Perform


Integrated

Change Control

4.5

Monitor and



Control

Project Work

6.6

Control


Schedule

Enterprise/

Organization

•  Organizational process assets

•  

W

ork performance information



•  Change requests

•  Schedule forecasts

Project documents 

updates


•  Assumption log

•  Basis of estimates

•  Lessons learned register

•  Project schedule

•  Resource calendars

•  Risk register

•  Schedule data

Project management 

plan updates

•  Schedule management 

plan

•  Schedule baseline



•  Cost baseline

•  Performance 

measurement baseline

Project


Management

Plan


Figure 6-23. Control Schedule: Data Flow Diagram

Updating the schedule model requires knowing the actual performance to date. Any change to the schedule baseline 

can only be approved through the Perform Integrated Change Control process (Section 4.6). Control Schedule, as a 

component of the Perform Integrated Change Control process, is concerned with:

u

u

Determining the current status of the project schedule,



u

u

Influencing the factors that create schedule changes,



u

u

Reconsidering necessary schedule reserves,



u

u

Determining if the project schedule has changed, and



u

u

Managing the actual changes as they occur.




224 

  

Part 1 - Guide

When an agile approach is used, Control Schedule is concerned with:

u

u



Determining the current status of the project schedule by comparing the total amount of work delivered and 

accepted against the estimates of work completed for the elapsed time cycle;

u

u

Conducting retrospectives (scheduled reviews to record lessons learned) for correcting processes and improving, 



if required;

u

u



Reprioritizing the remaining work plan (backlog);

u

u



Determining the rate at which the deliverables are produced, validated, and accepted (velocity) in the given time 

per iteration (agreed-upon work cycle duration, typically 2 weeks or 1 month);

u

u

Determining that the project schedule has changed; and



u

u

Managing the actual changes as they occur.



When work is being contracted, regular and milestone status updates from contractors and suppliers are a means of 

ensuring the work is progressing as agreed upon to ensure the schedule is under control. Scheduled status reviews and 

walkthroughs should be done to ensure the contractor reports are accurate and complete.

6.6.1 CONTROL SCHEDULE: INPUTS

6.6.1.1 PROJECT MANAGEMENT PLAN

Described in Section 4.2.3.1. Project management plan components include but are not limited to:

u

u


Download 5,05 Mb.

Do'stlaringiz bilan baham:
1   ...   297   298   299   300   301   302   303   304   ...   1107




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish