Schedule management plan.
Described in Section 6.1.3.1. The schedule management plan defines the method
used and the level of accuracy along with other criteria required to sequence activities.
u
u
Scope baseline.
Described in Section 5.4.3.1. The project WBS, deliverables, constraints, and assumptions
documented in the scope baseline are considered explicitly while sequencing activities.
6.3.1.2 PROJECT DOCUMENTS
Project documents that can be considered as inputs for this process include but are not limited to:
u
u