Table 5-1. Elements of the Project Charter and Project Scope Statement
5.3.3.2 PROJECT DOCUMENTS UPDATES
Project documents that may be updated as a result of carrying out this process include but are not limited to:
u
u
Assumption log.
Described in Section 4.1.3.2. The assumption log is updated with additional assumptions or
constraints that were identified during this process.
u
u
Requirements documentation.
Described in Section 5.2.3.1. Requirements documentation may be updated
with additional or changed requirements.