The standard for project management



Download 5,05 Mb.
Pdf ko'rish
bet206/1107
Sana11.01.2022
Hajmi5,05 Mb.
#348685
1   ...   202   203   204   205   206   207   208   209   ...   1107
Bog'liq
PMBOK Guide (6th Edition)

Figure 5-2. Plan Scope Management: Inputs, Tools & Techniques, and Outputs

Figure 5-3. Plan Scope Management: Data Flow Diagram

Tools & Techniques

Inputs

Outputs

Plan Scope Management

.1  Expert judgment

.2  Data analysis

• 

Alternatives analysis



.3 Meetings

.1  Project charter

.2  Project management plan

• 

Quality management plan



• 

Project life cycle description

• 

Development approach



.3  Enterprise environmental    

 factors


.4  Organizational process assets

.1  Scope management plan

.2  Requirements management  

 plan


• Project

   charter

5.1

Plan Scope



Management

Enterprise/

Organization

4.1


Develop Project

Charter


• Scope management plan

• 

R



equirements 

management plan

• Project charter

• 

Q



uality management plan

• Project life cycle description

• Development approach

• Enterprise environmental factors

• 

O

rganizational process assets



Project

Management

Plan

Project


Management

Plan



��

135


The scope management plan is a component of the project or program management plan that describes how the 

scope will be defined, developed, monitored, controlled, and validated. The development of the scope management plan 

and the detailing of the project scope begin with the analysis of information contained in the project charter (Section 

4.1.3.1), the latest approved subsidiary plans of the project management plan (Section 4.2.3.1), historical information 

contained in the organizational process assets (Section 2.3), and any other relevant enterprise environmental factors 

(Section 2.2).

5.1.1 PLAN SCOPE MANAGEMENT: INPUTS

5.1.1.1 PROJECT CHARTER

Described in Section 4.1.3.1. The project charter documents the project purpose, high-level project description, 

assumptions, constraints, and high-level requirements that the project is intended to satisfy.

5.1.1.2 PROJECT MANAGEMENT PLAN

Described in Section 4.2.3.1. Project management plan components include but are not limited to:

u

u


Download 5,05 Mb.

Do'stlaringiz bilan baham:
1   ...   202   203   204   205   206   207   208   209   ...   1107




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish