The standard for project management



Download 5,05 Mb.
Pdf ko'rish
bet183/1107
Sana11.01.2022
Hajmi5,05 Mb.
#348685
1   ...   179   180   181   182   183   184   185   186   ...   1107
Bog'liq
PMBOK Guide (6th Edition)

Tools & Techniques

Inputs

Outputs

Perform Integrated Change Control

.1  Expert judgment

.2  Change control tools

.3  Data analysis

• 

Alternatives analysis



• 

Cost-benefit analysis

.4  Decision making

• 

Voting



• 

Autocratic decision making

• 

Multicriteria decision



  analysis

.5 Meetings

.1  Project management plan

• 

Change management plan



• 

Configuration management

  plan

• 

Scope baseline



• 

Schedule baseline

• 

Cost baseline



.2  Project documents

• 

Basis of estimates



• 

Requirements traceability

  matrix

• 

Risk report



.3  Work performance reports

.4  Change requests

.5  Enterprise environmental    

 factors


.6  Organizational process assets

.1  Approved change requests

.2  Project management plan   

 updates


• 

Any component

.3  Project documents updates

• 

Change log




114 

  

Part 1 - Guide

12.3 

Control 


Procurements

8.3 


Control

Quality


4.3

Direct and 

Manage 

Project Work

13.4

Monitor


Stakeholder

Engagement

12.1 

Plan Procurement



Management

10.3


Monitor

Communications

9.3 

Acquire


Resources

4.3


Direct and

Manage


Project Work

12.2 


Conduct

Procurements

11.5

Plan Risk



Responses

9.4 


Develop

Team


5.5 

Validate


Scope

12.3 


Control 

Procurements

11.6

Implement Risk



Responses

9.5 


Manage 

Team 


5.6.

Control


Scope

13.1 


Identify

Stakeholders

11.7

Monitor


Risks

9.6


Control

Resources

6.6

Control


Schedule

13.3 


Manage

Stakeholder

Engagement

8.3 


Control

Quality


8.2

Manage


Quality

7.4. 


Control

Costs


• Project

   charter

4.5

Monitor and



Control

Project Work

Project

Management

Plan

Project


Documents

Project


Documents

4.6


Perform

Integrated

Change Control

• 

W



ork performance reports

• Change requests

• Approved change requests

• Approved change requests

• Change requests

• Approved change requests

Project documents updates

• Change log

Project management 

plan updates

• Any component

Project management plan

• Change management plan

• Configuration management plan

• Scope baseline

• Schedule baseline

• Cost baseline

Project documents

• Basis of estimates· 

• Requirements traceability matrix

• Risk report

Project


Management

Plan


Enterprise/

Organization

• Enterprise 

environmental 

factors

• Organizational 

process assets

Figure 4-13. Perform Integrated Change Control: Data Flow Diagram



��

115


The Perform Integrated Change Control process is conducted from project start through completion and is the 

ultimate responsibility of the project manager. Change requests can impact the project scope and the product scope, 

as well as any project management plan component or any project document. Changes may be requested by any 

stakeholder involved with the project and may occur at any time throughout the project life cycle. The applied level 

of change control is dependent upon the application area, complexity of the specific project, contract requirements, 

and the context and environment in which the project is performed.

Before the baselines are established, changes are not required to be formally controlled by the Perform Integrated 

Change Control process. Once the project is baselined, change requests go through this process. As a general rule, each 

project’s configuration management plan should define which project artifacts need to be placed under configuration 

control. Any change in a configuration element should be formally controlled and will require a change request.

Although changes may be initiated verbally, they should be recorded in written form and entered into the change 

management and/or configuration management system. Change requests may require information on estimated 

schedule impacts and estimated cost impacts prior to approval. Whenever a change request may impact any of the 

project baselines, a formal integrated change control process is always required. Every documented change request 

needs to be either approved, deferred, or rejected by a responsible individual, usually the project sponsor or project 

manager. The responsible individual will be identified in the project management plan or by organizational procedures. 

When required, the Perform Integrated Change Control process includes a change control board (CCB), which is a 

formally chartered group responsible for reviewing, evaluating, approving, deferring, or rejecting changes to the project 

and for recording and communicating such decisions.

Approved change requests can require new or revised cost estimates, activity sequences, schedule dates, resource 

requirements, and/or analysis of risk response alternatives. These changes can require adjustments to the project 

management plan and other project documents. Customer or sponsor approval may be required for certain change 

requests after CCB approval, unless they are part of the CCB.



116 

  

Part 1 - Guide

4.6.1 PERFORM INTEGRATED CHANGE CONTROL: INPUTS

4.6.1.1 PROJECT MANAGEMENT PLAN

Described in Section 4.2.3.1. Project management plan components include but are not limited to:

u

u




Download 5,05 Mb.

Do'stlaringiz bilan baham:
1   ...   179   180   181   182   183   184   185   186   ...   1107




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish