STNW1175-Standard-for-HV-EG-Connections


Partial load rejection 
S5.2.5.7 
Protection of generating systems from power system disturbances 
S5.2.5.8 
Protection systems that impact on power system security 
S5.2.5.9 
Protection to trip plant for unstable operation 
S5.2.5.10 
Frequency control 
S5.2.5.11 
Impact on Network capability 
S5.2.5.12 
Voltage control 
S5.2.5.13 
Active power control 
S5.2.5.14 
6.3 Reasonable approaches for voltage and reactive power control
It is expected that a Class B EG System should be capable of achieving the 
automatic access 
standard
set out in S5.2.5.13 of the NER. If a 
negotiated access standard
is proposed by an 
Applicant under clause 5.3A.9(f) or 5.3.9 of the NER, this will be assessed by the DNSP and 
AEMO (in respect of the AEMO advisory matters) under the framework contemplated by clause 
5.3.4A of the NER.
EG Systems under 5 MVA may be exempted from the requirement to operate in multiple modes.
6.3.1 Voltage control strategy
The DNSP may require that the design and operation of the control systems of an EG Unit or EG 
System be coordinated with the existing voltage control systems of the DNSP and of other 
Distribution System users, in order to avoid or manage interactions that would adversely impact on 
the DNSP and other Distribution System users. 
There will be cases were the DNSP will require the EG System to operate in voltage control mode
constant power factor mode, or reactive power control mode as specified in the Technical Study 
and Performance Standard or a combination of all three as required by the 
automatic access 
standard



Standard for High Voltage EG Connections 
 
STNW1175 
Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
40 of 60 
The Technical Study shall show that the voltage control strategy from the Proponent does not 
hinder the DNSP from achieving the system standards in Schedule 5.1a of the NER. 
Proponents should seek a control strategy with a dynamic response in accordance with the 
automatic access standard
in the NER. 

Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   40   41   42   43   44   45   46   47   ...   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish