Standard for High Voltage eg connections


 of 60  Table 25 DNSP Grid Isolation Device protection functions



Download 1,07 Mb.
Pdf ko'rish
bet40/64
Sana06.07.2022
Hajmi1,07 Mb.
#743644
1   ...   36   37   38   39   40   41   42   43   ...   64
Bog'liq
STNW1175-Standard-for-HV-EG-Connections

 
36 of 60 
Table 25 DNSP Grid Isolation Device protection functions
Protection functional description 
ANSI/IEEE C37.2 Code 
IEC 60617 Code 
Overcurrent (OC) 
51 
I> 
Earth Fault (EF) 
51G 
I0> 
Under voltage (UV) 
27P 
U< 
Over voltage (OV) 
59P 
U> 
Neutral voltage displacement (NVD) 
59N 
U0> 
Negative sequence current 
46 
I2> 
 
5.2.12 Grid Protection Relay 
The Grid Protection Relay (GPR) shall be installed to provide back-up protection functions to 
ensure the Distribution Network (at the Connection Point) and the installation is not exposed to a 
hazardous condition from the EG System.
The GPR shall meet the following requirements: 
a. coordinate multiple IES installations for one Connection Point
1

b. provide protection functionality using one relay for all IES installations for the one 
Connection Point
1

c. provide protection functions as prescribed in Table 20 for Class A1 and Table 21 for Class 
A2 to meet the requirements of this Standard
2

d. be integrated in such a way that it fails safe, and EG System(s) do not generate whilst the 
GPR is out of service;
e. open the Isolation Device at either the Proponent’s Connection Point or the EG system(s); 
and 
f. preserve safety of grid personnel and the general public. 
The GPR shall be connected as close to the Connection Point as practicable, referencing a single 
point beyond the Connection Point within the customer’s installation.
The GPR reference point shall be connected at a location that has a lower impedance to the 
Connection Point than any EG Unit connected within the customer’s installation. 
Note 1: Where there are both IES and Rotating Machine EG Systems connected at a single 
Connection Point, two GPRs are allowed to be installed where one GPR shall coordinate all IES 
and one GPR shall coordinate all Rotating Machines.
Note 2: One GPR may be used for the entire installation, to coordinate IES and Rotating Machine 
EG Systems connected at a single Connection Point, where voltage and frequency setpoints align 
to suite with IES EG Unit protection. NVD and Power Limit requirements shall continue to apply as 
per Rotating Machine requirements. 
Further information on GPR arrangements can be found in Appendix B: Connection arrangement 
requirements. 

Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   36   37   38   39   40   41   42   43   ...   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish