Owner: EGM Engineering
Release: 4, 11 Feb 2022 

Document ID: 2946177 
SME: Manager Generation & Customer Standards 
Uncontrolled When Printed
 
26 of 60 
4.11 Communication and SCADA requirements 
All communication and SCADA where established shall consider cybersecurity requirements in 
Section 4.13. 
4.11.1 Communication systems 
Communications interface requirements are outlined in Table 14. 
Table 14 Communications requirements per connection category 
Connection Class 
Communications requirement 
Class A1
No communications interface required 
Class A2
Communications interface for SCADA indication and control. Inter-tripping 
if required will also utilise the communication interface. 
Class B 
Refer to Section 6.7 
4.11.2 SCADA requirements 
The requirements of this Section shall apply as per Table 15. 
Table 15 SCADA requirements per connection category 
Connection Class 
SCADA Requirement 
Class A1
No SCADA interface required 
Class A2
SCADA interface required 
Class B 
Refer to Section 6.8 
4.12 Data and information 
4.12.1 Static data and information 
Static data and information shall be provided by the Proponent to the DNSP in accordance with 
Appendix D: Static Data and Information. 
4.12.2 Dynamic data and information 
Refer to Sections 6.8.2 and 6.8.3 for data and information to be provided when communications is 
required as per Technical Study. 
4.13 Cybersecurity and telecommunications 
4.13.1 Communications link 
The communications link is established to provide a method of transmitting the SCADA traffic via 
an IP medium.
The DNSP shall deploy an Edge Defence (ED) device that shall be physically installed within the 
communications room located within the DNSP zone substation, whilst the EG System shall deploy 
an Edge Defence (ED) Device that interfaces the DNSP telecommunications network.
The telecommunications link shall establish via IPv4 Layer 3 routable session (eBGP preferred)
and shall transit both ED devices, between the DNSP and Proponent. 



Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   23   24   25   26   27   28   29   30   ...   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish