Table 5 Bumpless transfer fault level study requirements
Proponent
DNSP
Class A1 / Class A2
All EG Systems for the
contribution within the
customer’s installation beyond
the Connection Point
May conduct for the
contribution to Distribution
System
Class B
Shall conduct for the
contribution to Distribution
System
The design and the commissioning shall be done under the supervision of an RPEQ for all
bumpless transfer EG systems except for Class A1 systems where no electronic interlocking is
implemented and is using a compliant transfer switch.
4.5 Network connection and isolation
Unless otherwise agreed with the DNSP, an EG System shall only connect to the Distribution
System via a single Connection Point. Connection to, and Parallel operation with any part of the
Distribution System is dependent upon compliance with the requirements outlined in this Standard
and the Connection Contract at each point where the EG System can Parallel with the Distribution
System.
The EG System shall be designed so that it does not exceed the ratings of equipment both within
the Distribution System and the Proponent’s side of the Connection Point when the EG System
operates in Parallel.
EG Systems that supply only part of the Proponent’s installation shall have adequate mechanisms
in place to prevent connection of the EG System to the Distribution System occurring without
synchronisation and the operation of associated protection systems.
The Proponent shall provide a means of isolation that is capable of disconnecting the entire EG
System from the Distribution System. Where the EG System is an aggregate of smaller distributed
EG Systems, multiple isolation points may exist. The means of isolation (where locakbale) shall be
able to be locked in the open position only.
The Proponent shall be responsible for the energisation of the transformer and associated
equipment, as well as ensuring that the operation is within the obligations of the Connection
Contract and any operating protocol agreed with the DNSP.
Where the auxiliary supply to the EG is from a separate Distribution System connection rather than
the main EG System Connection Point, this shall be clearly identified in the approved drawings as
well as in the SCADA system. The separate connection for auxiliaries shall only be through a
dedicated distribution substation LV connection and shall be implemented and charged as per
standard LV connection practices.
Do'stlaringiz bilan baham: