4.4.2 Export limit types
A Proponent can elect to have Partial- or Non-export EG System.
Partial-export EG Systems shall be designed and operated to limit the amount of Export into the 
Distribution System to an agreed Export threshold set out in the Connection Contract. 
Full Export EG Systems will not incorporate any such limitations and can Export into the 
Distribution System to the full nameplate capacity (full AC rating) of that EG System, noting 
dispatch constraints that may apply for Registered systems as well as curtailment schemes 
applicable for any EG Systems through the Connection Contract. 
Export limits are to be interpreted as “soft” controls, where a limit that causes the IES or Rotating 
Machines to reduce its output and prevent ongoing Export greater than the limit. “Hard” controls, a 
limit that will cause disconnection from the network may be used if “soft” controls cannot be 
achieved practically. 
4.4.3 Export limit settings
Where the EG System is approved by the DNSP as a Non-export or Partial-export system, it shall 
be fitted with Export power limiting control that limits the level of electricity exported at the 
Connection Point to the amount set out in the Connection Contract. Export limit are provided in 
Table 4 below. 
Table 4 Export limit settings
 
Non-export 
Partial-export 
Export limit setting (kW or MW) 

k
of total EG System rating 
Measured Export limit (kW or MW) 
0.05 of total EG System rating 
k
of total EG System rating
 
Note: Where 
k
is equal to the approved Partial-export power value as a per unit value of the inverter 
capacity.
The Export limit of the Proponent’s HV EG System is the maximum allowable Export limit. The 
Export ability of the Proponent’s HV EG System to Export at the limits described above are not 
guaranteed and will depend on the characteristics of the Distribution Network, which may change 
over time. Circumstances which may cause the Export to be constrained include but are not limited 
to when power quality response modes or curtailment schemes are in operation. 

Download 1,07 Mb.

Do'stlaringiz bilan baham:
1   ...   13   14   15   16   17   18   19   20   ...   64




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish