Software Engineering


  Computing environment implementation organization



Download 11,97 Mb.
Pdf ko'rish
bet564/584
Sana08.01.2022
Hajmi11,97 Mb.
#331302
1   ...   560   561   562   563   564   565   566   567   ...   584
Bog'liq
Software Engineering Architecture-driven Software Development ( PDFDrive )

20.4
  Computing environment implementation organization  
(software acceptance testing stage) ................................................................ 339
20.5
  Post-development process organization (software acceptance  
testing stage) ................................................................................................. 339
20.6
  Software test and evaluation (software acceptance testing stage) ..................... 339
20.7
  Reviews and milestones (software acceptance testing stage) ........................... 340
20.8
  Establish the software product baseline ........................................................... 341
Acceptance testing is the formal testing activity that involves enterprise, customer, 
and stakeholder representatives to witness the readiness of the software product to 
be deployed. If a contract was the genesis for the software development program, 
then this activity represents a significant step in demonstrating that the software 
development program has fulfilled its contractual obligations. If the project was 
funded by internal enterprise resources, then this activity provides proof that the 
program requirements have been satisfied and the product is ready for deployment. 
Such products may be distributed internally in support of business processes or they 
may be marketed as consumer software packages.
Prior to software deployment, the software configuration items must be subjected 
to a final examination to ensure that the software data packages are complete. The 
architecture technical data package (TDP) must be audited to ensure that it accurately 
reflects the “as-built and tested” software configuration. The functional configuration 
audit (FCA) inspects software test results to ensure that the software product satisfies 
its specifications, as augmented by change proposals. The physical configuration audit 
(PCA) inspects the definitive software deployment data package (DDP) to ensure that 
the as-built and tested software configuration is properly reflected in its documenta-
tion set. These configuration audits should be performed to establish the uniformity of 
the software product configuration to the architectural and configuration DDPs.
A deployment readiness review (DRR) should be conducted to present the 
results of acceptance testing, software configuration audits, and the status of each of 



Download 11,97 Mb.

Do'stlaringiz bilan baham:
1   ...   560   561   562   563   564   565   566   567   ...   584




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish