Software Engineering


Software engineering integrated product team (preliminary



Download 11,97 Mb.
Pdf ko'rish
bet524/584
Sana08.01.2022
Hajmi11,97 Mb.
#331302
1   ...   520   521   522   523   524   525   526   527   ...   584
Bog'liq
Software Engineering Architecture-driven Software Development ( PDFDrive )

 Software engineering integrated product team (preliminary 
architecture definition stage)
1. 
Refine the operational model.
 The software engineering integrated product team 
(SWE-IPT) should analyze each of the top-level functional components derived 
from the operational model to determine how to break down functional com-
plexity. The behavior of complex functional components should be analyzed to 
provide more insight into the software functional behaviors that must be formu-
lated to support the operational process. Functional behavior models should be 
prepared to facilitate functional analysis of complex functions. Derived func-
tions should be identified that are necessary to enable a functional component to 
behave properly and to detect and respond to failure conditions.
2. 
Refine the functional hierarchy.
 The SWE-IPT should conduct functional analy-
sis to decompose functional components to establish a more detailed functional 
hierarchy. Functional components should be decomposed into functional sub-
components until functional units are recognized. Functional decomposition 
alternatives should be evaluated and trade studies conducted to determine the 
performance, interfaces, and risks associated with each alternative. The pre-
ferred functional solution should be integrated into the functional hierarchy and 
reflected in the other artifacts of the functional architecture.
3. 
Synthesize conceptual configuration alternatives.
 The SWE-IPT should con-
duct software design synthesis to identify top-level conceptual components. 
Conceptual configuration alternatives should be identified and evaluated to nar-
row the solution space to one or more practical alternatives.
4. 
Analyze functional alternatives, conflicts, and trade-offs.
 The SWE-IPT should 
evaluate identified functional decomposition, grouping, and allocation alterna-
tives to determine the best solution set. The risks associated with each alter-
native should be identified and assessed to distinguish architectural design 
schemes that eliminate, avoid, or reduce risks to an acceptable level. The pre-
ferred solution, in terms of a coherent set of functional behaviors and decompo-
sition, should be selected that provides the best performance, satisfaction of 



Download 11,97 Mb.

Do'stlaringiz bilan baham:
1   ...   520   521   522   523   524   525   526   527   ...   584




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish