Reading passages


 The author points out that it is almost impossible to estimate



Download 5,59 Mb.
Pdf ko'rish
bet262/278
Sana08.06.2022
Hajmi5,59 Mb.
#645094
1   ...   258   259   260   261   262   263   264   265   ...   278
Bog'liq
Reading passages

14. The author points out that it is almost impossible to estimate .
A)the effects of a drop of more than 10 percent in, the level of ozone concentration 
B)how wildlife has been affected by the increase in ultraviolet radiation 
C)the extent of ozone depletion in recent years 
D)the annual rate of skin cancer due to ozone depletion 
E) what the effects of ozone hole will be 
15. The author points out that a 10 percent increase in human skin 
cancer would be likely to occur.
A)unless measures could be found to prevent ozone layer depletion 
B)should there be 20 percent increase in ultraviolet radiation 
C)if there were a 5 percent drop in the ozone layer density 


 
 
241 
D)if ^rgent action were not taken to prevent it 
E) as long as they don't use preventive lotions 
There are several kinds of dams. One kind is called an earth dam. This consists of a large 
bank of earth with steep sides. Along the length of the base of the dam a cut-off wall is 
constructed and this extends down to an impervious stratum. The function of the cut-off 
wall is to make the foundation watertight. Openings are made in the base of the dam to 
allow water to escape, thus controlling the level of water in the reservoir and providing a 
regular supply of water. These openings are called sluices. There is one disadvantage with 
this kind of dam. The material does not become watertight until the reservoir is full of 
water. 
 
16. The passage describes, in broad terms,.
A)a number of disadvantages related to earth dams 
B)the advantages of various types of dams 
C)the differences between the various types of dams 
D)the technical features of an earth dam 
E) common features of dams 
17. According to the passage, the function of sluices in an earth dam is to_______ .
A) prevent any escape of water 
B)provide support for the cut-off wall 
C)direct the flow of incoming water 
D)maintain a regular supply of water in the reservoir. 
E) leak wter when needed 

Download 5,59 Mb.

Do'stlaringiz bilan baham:
1   ...   258   259   260   261   262   263   264   265   ...   278




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish