Public-Private Partnership (ppp) Handbook


Table 6: Prerequisites of PPP Options



Download 2,03 Mb.
Pdf ko'rish
bet60/133
Sana16.01.2022
Hajmi2,03 Mb.
#371933
1   ...   56   57   58   59   60   61   62   63   ...   133
Bog'liq
public-private-partnership

Table 6: Prerequisites of PPP Options
 
 
 
 
 
 
Government   
 
 
 
 
 
 
Capacity 
 
 
 
Cost 
 
 
for Contracting, 
 
 
Political 
Recovery   Regulatory  Information 
 Management,   
 
Option 
Commitment 
Tariffs 
Framework 
Base 
and  Analysis
Service Contract 
Low 
Low 
Low 
Low 
Moderate
Management Contract 
Moderate 
Moderate 
Moderate 
Low 
Moderate
Lease 
Moderate 
High 
High 
High 
High
Concession 
High 
High 
High 
High 
High
Build–Operate–Transfer 
High 
Variable 
High 
High 
High 
and variations
Source: Heather Skilling and Kathleen Booth. 007.


Introduction

4
and anticipated financing. These discussions also generate market interest in an opportunity 
and may broaden the pool of potential bidders. Collecting this market feedback from po-
tential private partners during the design/preparatory phases ensures that the bid package 
attracts interest.
Based on these three criteria, the available options can be ranked and the government can 
take an informed decision on the PPP strategy to be adopted. The road map will then be 
updated to reflect the PPP option selected and preparatory work can start. 
Structuring a PPP: Selecting the Option    7


Introduction

4
6  PPP Preparatory Work
The sector strategy and road map (updated based on the PPP option selection) outline the 
work to be done to create the enabling environment and structure the PPP transaction. In 
general, the preparatory work falls within the same categories as the sector diagnostic, and 
addresses the constraints identified through sector analysis:
• 
legal, regulatory, and policy frameworks; 
• 
technical issues;
• 
institutional and capacity building; and
• 
commercial, financial, and economic issues.
The preparatory stage culminates in the achievement of an environment conducive to sus-
tainable reform and in a well-defined, documented, and agreed-upon PPP process. 
6.1 

Download 2,03 Mb.

Do'stlaringiz bilan baham:
1   ...   56   57   58   59   60   61   62   63   ...   133




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish