Professor Patrick Zou (Bio for anzsig as at 11 March 2013) background



Download 51,03 Kb.
bet2/3
Sana27.02.2017
Hajmi51,03 Kb.
#3477
1   2   3

B. Scholarly Book Chapters




  1. Zou P.X.W. (2013), Chinese Cultural Heritage: Influences on University Learning and Teaching, Academic Migration, Discipline Knowledge and Pedagogical Practice: Voices from the Asia Pacific (Editors: Rawlings-Sanaei F. and Mason C.), date of accepted: 4 Feb 2013. Springer.



  1. Zou P.X.W. and Fang D.P. (2012), Risks, opportunities and strategies in international construction: A case study of China, Contemporary Issues of Construction in Developing Countries (Editor: Ofori G.), Taylor and Francis. 215 - 241.


C Refereed Journal Articles




  1. Liu J.Y., Zou P.X.W. and Gong W. (2013), Managing project risk at enterprise level: Exploratory case studies in China, ASCE's Journal of Construction Engineering and Management, date of acceptance: 6 March 2013.

  2. Sunindijo R. and Zou P.X.W. (2013), Conceptualizing Safety Management in Construction Projects, ASCE's Journal of Construction Engineering and Management, date of acceptance: 28 Feb 2013.

  3. Zou P.X.W. and Sunindijo R.Y. (2012), Skills for managing construction safety risks, implementing safety tasks and developing safety climate, Automation in Construction, Date of acceptance 23 Feb 2012.

  4. Javed, A., Lam P and Zou PX.W. (2012) Public private partnership output specifications – lessons from Australia, Journal of Facilities Management, Vol. 11(1), 5 - 30.

  5. Sunindijo R. Y. and Zou P.X.W. (2012), How project Manager’s skills may influence the development of safety climate in construction projects, International Journal of Project Organisation and Management, 4(3), 286-301.

  6. Zou P.X.W. and Couani P. (2012), Managing risks in green building supply chain, International Journal of Architectural Engineering and Design management, Vol. 8, 143 – 158.

  7. Sunindijo, R.Y. and Zou, P.X.W. (2012). “Political skill for developing construction safety climate”. Journal of Construction Engineering and Management. Vol. 138 (5), 605 – 612.

  8. Zou P.X. W. (2011) Fostering A Strong Construction Safety Culture, ASCE Leadership and Management in Engineering. 11(1), 11–22. This paper was a Top-Downloaded Paper and selected as the Journal’s Front Page Research Highlight



  1. Li J. and Zou P.X.W. (2011) Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects, ASCE Journal of Construction Engineering and Management, 137(12) 1205 – 1209.

  2. Zou P.X.W., Xin Q., Zhang K.G.M. and Wang S.Q. (2011), System Dynamics Based Risk Factors Analysis of China’s Building Energy Efficiency Market, International Journal of Project Organization and Management Special Issue on Risk Management in Projects and Enterprises, Vol 3(3/4), 352 - 373.

  3. Sunindijo, R.Y. and Zou, P.X.W. (2011). “CHPT construct: Essential skills for construction project managers”. International Journal of Project Organisation and Management, 3(2), 139-163.

  4. Zou P.X.W., Ying Chen and Tse-Ying Chan, (2010), Understanding and improving your risk management capability – an assessment model for construction organisations, ASCE Journal of Construction Engineering and Management, 136 (8), 854 – 863. This paper was a Top-Downloaded Paper among the 126 articles published by the Journal in 2010.



  1. Zou P.X.W. and Leslie-Carter R. (2010) Lessons learned from managing the design of the “Water Cube” National Swimming Centre for Beijing 2008 Olympic Games, Architectural Engineering and Design Management, Vol.6, 175 – 188. This paper was selected by the editor as the Journal’s Featuring Article.



  1. Zou P.X.W. and Li J. (2010), Risk identification and assessment in subway projects: Case study of Nanjing Subway Line 2, Construction Management and Economics, 28, 1219–1238.

  2. Zhang L. Zhao M.H., Zhao H. and Zou P.X.W. (2010), Analysis of Geocell Reinforced Mattress with Consideration of Horizontal-vertical Coupling, Computers and Geotechnics, Date of Acceptance: 5 June 2010.

  3. Zou P.X.W. and Zhang G.M. (2009), Comparative study on the perception of construction safety risks in China and Australia, ASCE Journal of Construction Engineering and Management, Vol. 135 (7), 620 – 627.

  4. Zou P.X.W. and Zhang G.M. (2009), Managing Risks in Construction Projects: Life Cycle and Stakeholder Perspectives, International Journal of Construction Management, Vol. 9 (1), 61 – 77.

  5. Zou P.X.W., Deng T.J., and Zhou X.Y. (2009), The shaping of a zero-accident construction safety culture, China Safety Science Journal (CSSJ) (in Chinese), 19(6) 77 – 84.

  6. Zhang L., Zhao M.H., Zou P.X.W. and Zhao H., (2009), Deformation analysis of geocell reinforcement using Winkler model, Computers and Geotechnics, 36(2009), 977 – 983.

  7. Li J. and Zou P. X. W. (2009) Risk Assessment of Subway Projects: Case of Nanjing Subway Line 2. Construction Economy (in Chinese), 2009 (5), 71-74.

  8. Zou P.X.W., Redman S. and Windon S. (2008), Case Studies on Risk and Opportunity Assessment at Design Stage of Building Projects in Australia: Focus on Safety, Architectural Engineering and Design Management, Earth scan, Vol. 4, 221 – 238.

  9. Zou P.X.W., Wang S.Q. and Fang D.P., (2008), “A life-cycle risk management framework for PPP infrastructure projects”, Journal of financial management of property and construction, 13(2), 123 – 142. This paper was awarded “2009 Emerald Literati Network Awards for Excellence Outstanding Paper Award Winner”.



  1. Zou P. X.W. and Wong A. (2008), “Breaking into China’s Design and Construction Market”, Journal of Technology Management in China, Vol. 3(3), 279-291.

  2. Zou P.X.W. (2008), “Designing effective assessment in postgraduate construction management studies”, Journal for Education in the Built Environment, Vol 3, Issue 1, 80 – 94.

  3. Li J. and Zou P.X.W. (2008), “An investigation on contractors’ risk perception of PPP projects in China” Journal of Construction Economics, (in Chinese) 29(8), 30-34.

  4. Li J. and Zou P.X.W. (2008), “Risk Identification and Assessment in PPP Infrastructure Projects Using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology” Australian Journal of Construction Economics and Building, 8(1), 32-46.

  5. Zou P.X.W. (2008), “Working together to achieve Graduate Attributes of Our Students”, CEBE Transactions, 5(1) 25 – 42.

  6. Zhang G.M. and Zou P.X.W. (2007), “A Fuzzy Analytical Hierarchy Process (AHP) Risk Assessment Approach for Joint Venture Construction Projects in China”, ASCE Journal of Construction Engineering and Management, 133(10), 771 – 779.

  7. Zou P.X.W., Zhang G. and Wang J.Y. (2007), “Understanding the key risks in construction projects in China” International Journal of Project Management, 25(6), 601 -- 614.

  8. Zou P.X.W. (2007) “A Longitudinal Study of E-Learning for Construction Management education”, Journal for Education in the Built Environment, Vol 2 (2), 61-84.

  9. Zou P.X.W., (2007), “An Overview of China’s Construction Project Tendering” International Journal of Construction Management, 7(2), 23 -39.

  10. Zou P.X.W., Fang D.P., Wang S.Q. and Loosemore M. (2007), “An overview of the Chinese construction market and construction management practice” Journal of Technology Management in China Vol. 2(2), 163 -176.

  11. Zhao M.H. Zou X.J. and Zou P.X.W. (2007) “Disintegration characteristics of red sandstone and its filling methods for highway roadbed and embankment”, ASCE Journal of Materials in Civil Engineering, Vol. 19(5), 404-410.

  12. Zou P.X.W., (2006), Strategies for Minimizing Corruption in the Construction Industry in China, Journal of Construction in Developing Countries, Vol. 11(2), 15-29.

  13. Zou P.X.W. and Darvish H. (2006), Group assignment and teamwork skill development in postgraduate construction management studies, Architectural Engineering and Design Management Vol 2(3), 203-215.

  14. Zou P.X.W., and Lim B.T.H, (2006), “An empirical study in subcontractor selection and long-term alliance relationship between main-contractor and subcontractor”, International Journal of Construction Management. Vol. 6(1), 1-13.

  15. Zou P.X.W., and Seo Y. (2006), “Effective application of e-commerce technologies in construction supply chain”, Journal of Information Technology in Construction Special Issue on E-commerce in Construction. Vol. 11, 127 – 147.

  16. Chung J.K.H., Shen G.Q.P., Leung B.Y.P., Hao J.J.L., Hills M.J., Fox P.W. and Zou P.X.W. (2006), Using e-learning to deliver construction technology for undergraduate students A case study in Hong Kong, Architectural Engineering and Design Management, Vol 1(4), 295 —308.

  17. Zou P.X.W., Tang J.M. and Ji J. (2006), An analysis of the collapse of the New York World Trade Centre Twin Towers, Earthquake Engineering and Vibration, 26 (3), 31– 33.

  18. Zou P.X.W. and Shang S.P. (2006) Time-Dependent Behaviour of Concrete Beams Pretensioned by Carbon Fibre-Reinforced Polymers (CFRP) Tendons, Construction and Building Materials, 21(2007), 777 -- 788.

  19. Zou P.X.W. and Roslan B. A. (2005), Different Perspectives towards using Web-based Project Management Systems in Construction: Large-Sized Enterprises Versus Small- and Medium-Sized Enterprises, Architectural Engineering and Design Management Special Issue: Working in an nD Environment” Vol. 1 (2), 127-143.

  20. Zou P.X.W., McGeorge D. and Ng S, (2005), Small- and Medium-Sized Enterprises’ Perspectives towards Construction Supply Chain Management and E-Commerce, International Journal of Construction Management Vol. 5 (1), 1-19.

  21. Zou P.X.W., (2004), Knowledge Management Practice in Two Australian AEC Companies, Australian Journal of Construction Economics and Building, Vol. 4(2), 19 – 31.

  22. Zou, P.X.W. (2003), Flexural behaviour and deformability of fibre reinforced polymer prestressed concrete beams, Journal of Composite for Construction, American Society of Civil Engineers (ASCE), Vol. 7 (4), 275-284.

  23. Zou, P.X.W. (2003), Theoretical study on short-term and long-term deflections of fibre reinforced polymer prestressed concrete beams, Journal of Composite for Construction, American Society of Civil Engineers (ASCE), Vol. 7 (4), 285-291.

  24. Zou, P.X.W. (2003), Long-term deflection and cracking behaviour of concrete beams prestressed with CFRP tendons, Journal of Composite for Construction, American Society of Civil Engineers (ASCE), Vol. 7 (3), 187-193.

  25. Zou, P.X.W. (2003), Long-term properties and transfer length of fibre reinforced polymers, Journal of Composite for Construction, American Society of Civil Engineers (ASCE) Vol. 7 (1), 10-19.

  26. Drew D. S., Shen L.Y. and Zou, P.X.W. (2002), Developing an optimal bidding strategy in two envelope fee bidding, Construction Management and Economics Vol. 20 (7) 611 - 620.

  27. Drew D. S., Kwok C.W. Zou, P.X.W. and Shen L.Y. (2002), Determining an optimal bidding strategy in two envelope fee bidding, The Australian Journal of Construction Economics and Building Vol. 2 (2), 1 - 9.

  28. Zou P.X.W. and Han X.L. (2002), Behaviour of fibre reinforced plastics (FRP) prestressed concrete beams, Journal of Building Structures (in Chinese), Oct 2002.

  29. Han X.L., Zou P.X.W. and Ji J. (2002), Fibre reinforced plastics (FRP) used in concrete structures: properties and development, Journal of South China University of Technology (in Chinese), Vol. 30 (2), 69-72.

  30. Gowripalan, N., Zou, X.W. and Gilbert, R.I. (1997), Flexural behaviour of prestressed beams using Aramid Fibre Reinforced Plastic (AFRP) tendons, Australian Civil/Structural Engineering Transactions, Institution of Engineers, Australia, Vol. CE39, No. 2 & 3, 71-76.

  31. Gowripalan. N., Zou, X.W., Mohamed, H.J and Gilbert, R.I. (1997), Fibre Reinforced Plastic (FRP) – A New Generation of Reinforcement and Prestressing Tendons for Concrete Structures, Australian Civil/Structural Engineering Transactions, Institution of Engineers, Australia, Vol. 39, No. 2 & 3, 61-70.



Download 51,03 Kb.

Do'stlaringiz bilan baham:
1   2   3




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish