Introduction to Health and Safety at Work


Inspection – Regulation 6



Download 5,86 Mb.
Pdf ko'rish
bet614/722
Sana20.07.2022
Hajmi5,86 Mb.
#825654
1   ...   610   611   612   613   614   615   616   617   ...   722
Bog'liq
introduction to health safety at work

17.26.6 Inspection – Regulation 6
Where the safety of work equipment depends on the 
installation conditions, it must be inspected:

after installation and before being put into service 
for the fi rst time

after assembly at a new site or in a new location

to ensure that it has been installed correctly and is 
safe to operate.
Where work equipment is exposed to conditions causing 
deterioration which is liable to result in dangerous situa-
tions it must be inspected:

at suitable intervals

when exceptional circumstances occur.
17.26 
Pr
ovision and Use of W
ork Equipment Regulations 1998 (except part IV) as amended in 2002


Summary of the main legal requirements
377
Inspections must be determined and carried out by com-
petent persons. An inspection will vary from a simple 
visual external inspection to a detailed comprehensive 
inspection which may include some dismantling and/or 
testing. However, the level of inspection would normally be 
less than that required for a thorough examin ation under
for example, LOLER for certain items of lifting equipment.
Records of inspections must be kept with suffi cient 
information to properly identify the equipment, its normal 
location, dates, faults found, action taken, to whom faults 
were reported, who carried out the inspection, when 
repairs were made, date of the next inspection.
When equipment leaves an employer’s undertaking 
it must be accompanied by physical evidence that the 
last inspection has been carried out.
17.26.7 Specifi c risks – Regulation 7
Where the use of work equipment involves specifi c haz-
ards, its use must be restricted to those persons given 
the specifi c task of using it and repairs, etc. must be 
restricted to designated persons.
Designated persons must be properly trained to 
fulfi ll their designated task.
Hazards must be controlled using a hierarchy of 
control measures, starting with elimination where this is 
possible, then considering hardware measures such as 
physical barriers and, lastly, software measures such as 
a safe system of work.

Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   610   611   612   613   614   615   616   617   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2025
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish